Laserfiche WebLink
WATER PROJECTS <br />FISCAL YEAR 199&99 (QTR 3) <br />TABLE 4 <br />971019 <br />CIP # <br />REVENUES <br /> <br /> <br />ADOPTED <br />1998.99 <br />1996-99 <br />CARRYOVER & <br />AMENDM1fEhTS <br /> <br />ADOPTED <br />A6tENDAtENTS RECOMMENDED <br />QTR } <br />1998-99 <br />AMENDMENTS FIhA1 <br />ADJUSTED <br />Bl,'DGET <br />1998-~ <br />EXPANSION FUND <br />FUND: 355, 497 <br />ESTIMATED EXPANSION FUND BALANCE JULY 1, 1998 <br /> <br />1,134.953 <br /> <br />1.457.244 <br /> <br />2,592.197 <br />ESTIMATED REVENUES: <br />CONNECTION FEES: <br />Residential 813.600 (282?00) 531.400 <br />Commercial 22.600 22,600 <br />NPID Connection Fee's <br />Less transfer to next years revenue (836.200) 282 ?00 (884.000) <br /> <br />Interest 68.000 72,000 140,000 <br /> <br />Total Estimated Expansion Revenues 68.000 0 72.000 0 140,000 <br />Developer Contributions: <br />Reconstruct Canyon Meadows Hydropneumatic Station (497) 25.000 25 000 <br /> <br />Recycled Water Feasibility Study: <br />DSRSD Contibutions 243 2.500 2,743 <br />Transfer from Sewer Expansion Fund <br /> <br />Less transfer to General Fund for CIP engineering (77.914) 9,874 (68.030) <br />TOTAL EXPANSION FUNDS AVAILABLE 1,125,039 1,482,487 84,374 0 2,691,900 <br />EXPANSION PROJECT TOTALS 300,144 1,279,966 247,025 0 1.827,135 <br />ENDING EXPANSION FUND BALANCE 6/30/99 5824,895 5202,521 (5162,651) SO 5864,765 <br />EXPANSION PROJECTS <br /> <br /> <br /> <br />ROJECT DESCRIPTION <br /> <br />ADOPTED <br />199e-99 <br />1996-99 <br />CARRYOVER 8 <br />AMENDMENTS <br /> <br />ADOPTED <br />AMENDM1fENTS RECOMMENDED <br />QTR 3 <br />1998-99 <br />AMENDMENTS FfNAL <br />ADJUSTED <br />BUDGET <br />1998-99 <br /> <br />Utility Billing Softwaze 3,856 3,856 <br />Grey Eagle Hydropneumatic 0 <br />Operational Engineering Studies (SO%) 31,199 31,199 <br />Del Valle Parkway Water Main Extension 442,870 442,870 <br />Water Conservation Devices and Materials 38,070 38,070 <br />Lease Payments: (Series A & B Bonds) (33%) 287,644 287,644 <br />Water Quality Monitors -Phase II (50%) 14,206 14.?06 <br />Water Connection Fee Update 15,000 15,000 <br />Water System Master Plan Update 75.000 75,000 <br />Bonde Water System Master Plan Update 40,000 40,000 <br />Recycled Water Feasibility Study 464 5,000 5,464 <br />Utility Billing Vehicle- Meter Reading 4,226 4,226 <br />Reconstruct Canyon Meadows Pump Station 125,000 30,000 155,000 <br />Looped Water Main System on First Street at Stanley 299,225 196,800 496,025 <br />Water Well Chemical Feed System Modifications. (33%) 12,500 33,520 46,020 <br />Muni Golf Course 82.621 82,621 <br />Tassajara Reservoir Expansion 17,457 17,457 <br />Electrical Panel Upgrading 57,252 57,252 <br />Utility Mapping Project 15,225 15,225 <br />TOTAL EXPANSION PROJECTS 300,144 1,279,966 247,025 0 1,827,135 <br />ENDING EXPANSION FUND BALANCE 6!30/99 5824,895 5202,521 (5162,651) SO 5864,765 <br />808046 <br />891010 <br />941014 <br />941015 <br />941017 <br />948056 <br />981018 <br />971013 <br />971014 <br />971015 <br />971016 <br />971017 <br />971019 <br />971023 <br />971025 <br />968036 <br />969001 <br />971010 <br />968043 <br />Q1w99 xls <br />