Laserfiche WebLink
WATER PROJECTS <br />FISCAL YEAR 199&99 (QTR 3) <br />TABLE 4 <br />CIP # <br />808046 <br />921012 <br />921037 <br />931016 <br />931018 <br />931022 <br />941010 <br />941019 <br />941024 <br />941027 <br />948056 <br />951000 <br />951015 <br />961000 <br />961010 <br />961017 <br />968043 <br />971025 <br />97]011 <br />97]000 <br />971002 <br />971005 <br />971009 <br />971010 <br />971012 <br />971018 <br />981000 <br />981002 <br />981005 <br />981006 <br />9810]0 <br />981011 <br />949007 <br />949008 <br />949005 <br />REPLACEMENT & IMPROVEMENT PROJECTS <br /> <br /> <br /> <br />ROJECT DESCRIPTION <br /> <br />ADOPTED <br />1998-99 <br />1998-99 <br />CARRYOVER & <br />AMENDMENTS <br /> <br />ADOPTED <br />A.\tENDAtEMS RECOMMENDED <br />QTR 3 <br />1998-99 <br />AMENDMENTS FINAL <br />ADJUSTED <br />BLDGET <br />1998-99 <br />Utility Billing Software 1,091 1.091 <br />First St. and Kottinger Tie-in 25.000 (22.773) (2,227) 0 <br />Wells 6 & 7 Repairs 34,770 34,770 <br />CortosionControls 50?01 (50.201) 0 <br />Water Service Study 2.980 2 980 <br />Update Standard Specifications and Plans 3.718 3,718 <br />Annual Electrical Panel Restoration 20,547 (12?99) g?4g <br />Reconstruct Control Valves: Santos Ranch Rd.-Phaze II 56.818 56,818 <br />Automated Ion Analyzer 35,000 35.000 <br />Seismic Vulnerability Study 35.000 35.000 <br />Lease/Installment Payments (Series A & B Bonds) (67%) 575?88 575,288 <br />Annual Water main Replacement and Improvement Project 432,531 432,531 <br />Water Quality Monitors -Phase II (50%) 14?06 14?06 <br />Annual Water Main Replacement and Improvement Project (100 %) 251,153 22,773 2,227 276, ] 53 <br />Annual Electrical Panel Restoration (]00%) 15.000 (12.925) 2,075 <br />BackFlow~ Devices (100°/) 8.913 8.913 <br />Utility Mapping Project 12,000 9,345 ~ 1.345 <br />Water Well Chemical Feed System Modifications. (67%) 39,000 110.000 149,000 <br />Control Valvelnstallation 3].028 (17,742) 13,286 <br />Replace Backhce No. 322 11,276 (I 1,276) 0 <br />Replacement of Polybu[ylene Service Laterals 50,000 (50,000) 0 <br />Water System ReplacemenUImprovemen[ Study Update 15.000 989 15,989 <br />Alarm Dialing System 15,345 15.345 <br />Electrical Panel Upgrading 41.632 (41,632) 0 <br />Water Main Replacement on Bonita Ave. and Entrada Dr. 303,800 303.800 <br />Lining & Coating -Steel Water Tanks 698,614 698.614 <br />Portable Generator Longview Booster Station 41.000 61.276 102.276 <br />Replace Polybutylene Service Laterals 50,000 50,000 100.000 <br />Replace Central Computer 70.000 70,000 <br />Water Main Replacement 300.000 300,000 <br />Electrical Panel Upgrading 30.000 66,856 96.856 <br />Control Valve Installation 20.000 17.742 37,742 <br />NPID 26 Fundcd Projects <br />Longview Dr Pump Sta Capacity Upgrade 844 53,144 39,352 93,340 <br />Foothill Water Line - N of Caztlewood, Phase II 313,582 (37,519) 14,177 290.240 <br />Verona Road- Bridge Water Line 1,085 I,O85 <br />TOTAL REPLACEMENT/IMPROVEMENT 1,125.288 2,590,049 25,758 54,614 3,795,709 <br />ENDING REPLACEMENT FUND BAL: 6/30/99 54,179,478 559,733 587,450 (517,931) 54,308,730 <br />Q3w99.xls <br />