Laserfiche WebLink
<br />Draft Environmental Impact Report <br />Bernal Property Phase II Specific Plan <br /> <br /> <br />1 . Framework for Analysis <br /> <br />This section assesses the hydrologic and water quality environment of the Bernal Property <br />Phase II Specific Plan area based on an inspection of current site conditions, published and <br />unpublished hydrologic reports, and topographic and floodplain maps. This section also <br />assesses potential impacts on groundwater resources associated with grading, erosion and <br />sedimentation, and introduction of new sources of pollutants to runoff that could result <br />from implementation of the Specific Plan and the Bernal Community Park Master Plan. <br /> <br />2. Setting <br /> <br />The setting of the Plan area was described in the Bernal Property Phase I Specific Plan El R, <br />and that setting discussion covered all the Phase II area. The following discussion is based <br />on the Phase I EIR, supplemented by additional references and a recent site reconnaissance. <br /> <br />The 318-acre Phase II Plan area drains into the Arroyo de la Laguna, which forms the <br />western boundary of the Plan area. The floodplain (loo-year FEMA flood hazard zone) <br />associated with Arroyo de la Laguna in the vicinity of the Plan area is generally confined to a <br />band about 200 feet wide along the active channel. According to Zone 7, the Arroyo de la <br />Laguna north of the Bernal Avenue bridge has been improved as an open channel with <br />capacity to accommodate the 1oo-year flood flow of 17,000 cubic feet per second (cfs). No <br />floods have been recorded which have exceeded the 1 OO-year flood. <br /> <br />Improvements to the onsite drainage system were described in the Bernal Property Phase I <br />Specific Plan EIR and most of these improvements have either been completed or are <br />currently under construction. Two detention basins have been constructed (one in the <br />central portion of the Plan area and the other in the southwest corner of the Plan area). <br />These basins are reported to contain water for much of the yearP During a site inspection <br />in October, 2005, the central basin did not appear to contain any water. Some water was <br />observed in the northern portion of the southwestern basin during a site reconnaissance in <br />October, 2005. In addition, the realignment and enhancement of the drainage channel <br />along the boundary of the Eastern Area is under way. <br /> <br />Based on regional studies, the depth to groundwater at the Plan area ranges from about 20 <br />to 25 feet below ground surface (bgs).28 In preparation for development of the Phase I <br />residential areas, geotechnical borings were completed at the Plan area in 2000. The logs for <br />the borings indicate that in the vicinity of the detention basins, the underlying sediments <br />consist of a heterogeneous mixture of silty clay, silty sand and clayey silt. In the vicinity of <br />the central detention basin, the depth to groundwater ranges from 18 feet bgs to greater <br /> <br />27 Rasmussen, Wayne, President, Rasmussen Planning, personal communication with Bruce Abelli-Amen of <br />BASELINE, October 20, 2005. <br />28 United States Geological Survey, Water Quality Conditions and an Evaluation of Ground.and Surface Water <br />Sampling Programs in the livermore-Amador Valley, California, Water Resources Investigations Report 84- <br />4352, 1985. <br /> <br />86 <br />