Laserfiche WebLink
<br />Draft Environmental Impact Report <br />Bernal Property Phase II Specific Plan <br /> <br />3. Key Project Characteristics, Impacts, and Mitigation Measures <br /> <br />a. Key Project Characteristics <br /> <br />The Bernal Property Phase II Specific Plan provides for the development of a 318-acre City- <br />owned site located west of downtown. Development under the Plan would include open <br />space, parks, sports fields, and a range of other civic and institutional uses, as described in <br />Chapter 2 of this EI R. The Phase II Bernal Property site is currently undeveloped with the <br />exception of sub-areas 4 and 8 (occupied respectively by Fire Department Station #4 and <br />Hearst Elementary School). <br /> <br />b. Significance Criteria <br /> <br />Significance criteria for the project's impacts on police resources are drawn from CEQA <br />Guidelines Appendix G (Item XIII (a)). Impacts on police protection would be significant: <br /> <br />[If the project would] result in substantial adverse physical impacts associated with the <br />provision of new of physically altered governmental facilities, need for new or physically <br />altered governmental facilities, the construction of which could cause significant envi- <br />ronmental impacts, in order to maintain acceptable service ratios, response times or <br />other performance objectives for police protection. <br /> <br />c. Impacts <br /> <br />The Bernal Property is within the service area of the Pleasanton Police Department. Service <br />to the site is coordinated through the Police Department office, which is located in its own <br />building at 4833 Bernal Avenue, nearby to the Bernal Property. <br /> <br />The undeveloped portion of the Bernal Property did not generate any police service calls in <br />2004 and 2005. Department staff state that service calls come predominantly from <br />developed areas ofthe City. <br /> <br />With development under the Specific Plan, it is reasonable to expect both a greater commit- <br />ment of Police Department personnel to patrol the site area and an increase in service calls. <br />Based past service call volume from Pleasanton's parks, service call volume from the Bernal <br />site would be in the range of 320+ calls annually, or about one per day. <br /> <br />At the level of increased demand for Police services anticipated, it does not appear likely that <br />additional facilities would be required to increase Police service levels at the Phase II Specific <br />Plan site. Therefore, no adverse impact on public services relating to the Police Department <br />are found. <br /> <br />d. Mitigation Measures <br /> <br />No significant adverse impacts are identified; therefore, no mitigation measures are <br />required. <br /> <br />118 <br />