My WebLink
|
Help
|
About
|
Sign Out
RES 06035
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2006
>
RES 06035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2006 4:17:08 PM
Creation date
6/7/2006 4:02:28 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/16/2006
DOCUMENT NO
RES 06035
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Draft Environmental Impact Report <br />Bernal Property Phase II Specific Plan <br /> <br />3. Key Project Characteristics <br /> <br />a. Key Project Characteristics <br /> <br />Land use components of the Phase II Specific Plan would include recreational, institutional, <br />public, and open space uses as described in the Specific Plan (see Chapter 2 of this EIR and <br />the use descriptions in Appendix B). The Specific Plan includes a potential cultural arts <br />center, a potential youth/community center, and a series of baseball, soccer, and other <br />outdoor sports fields. In addition, the Plan includes a Fire Station #4, Hearst Elementary <br />School (both the fire station and the elementary school have already been constructed), a <br />park-and-ride lot, and an extensive system of open spaces and passive recreational uses. <br /> <br />Transportation components of the Specific Plan include road improvements, parking provi- <br />sion, and a multiple-use trail system. <br /> <br />The circulation system for the Phase I and Phase II Specific Plan areas is presented in Figure <br />19. Transportation system improvements to be provided in Phase II include: <br /> <br />o Major Street. Extension of Pleasanton Avenue (a collector street) into the project site <br />from Bernal Avenue to Valley Avenue, serving as a major access roadway to the uses <br />within the project and providing secondary connections to junipero Street and Case <br />Avenue. Pleasanton Avenue extension would also link the Central and Western Areas <br />ofthe Specific Plan area by connecting with Laguna Creek Lane at Valley Avenue. <br /> <br />The intersection of Pleasanton Avenue and Bernal Avenue would be one of the proj- <br />ect's major transportation features. Figure 20 presents a conceptual diagram of how <br />that intersection would be configured and Figure 21 shows a section of Pleasanton <br />Avenue as currently planned. <br /> <br />A key feature of the Pleasanton Avenue extension would be traffic roundabouts, <br />intended to moderate traffic speeds. Figure 22 provides a diagram of a roundabout. <br />The number of roundabouts that would actually be built has not been determined; <br />Figure 19 shows four between Bernal Avenue and Valley. <br /> <br />o Trails. Trails on the site, supported by trailheads, include the major trails and bike- <br />ways shown in Figure 22, a conceptual diagram showing trails included in the Phase <br />II Specific Plan and the Bernal Community Park Master Plan. <br /> <br />o Transit. The Phase II Specific Plan calls for accommodating public transportation as <br />an element of a multi-faceted approach to reducing automobile trips. Pleasanton <br />Avenue would be designed to accommodate Livermore-Amador Valley Transporta- <br />tion Authority (LAVTA) buses and stops/shelters. <br /> <br />o Parking. A potential park-and-ride commuter parking lot is shown in the Illustrative <br />Site Plan (Figure 5, p. 13) in sub-area 12. Parking provided in support of uses is also <br />shown conceptually in Figure 5. <br /> <br />132 <br />
The URL can be used to link to this page
Your browser does not support the video tag.