My WebLink
|
Help
|
About
|
Sign Out
RES 06035
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2006
>
RES 06035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2006 4:17:08 PM
Creation date
6/7/2006 4:02:28 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/16/2006
DOCUMENT NO
RES 06035
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Appendix B <br />Description of Potential Land Uses <br /> <br />The open space component of the Phase II Plan Area is planned to create the identify- <br />ing character of the Bernal Property, and to help define the appropriate sites for com- <br />munity facilities and trail corridors. The open space framework is to further provide <br />settings, within which the Grand Park design strategies presented in Chapter 4 of the <br />Phase II Specific Plan can be implemented. <br /> <br />11. Park and Recreational Uses - Park and recreational uses could include lighted and <br />unlighted sports fields, tennis, children's playgrounds, amphitheater, botanical garden, <br />arboretum, public art, memorial groves and gardens, lakes and ponds, bird sanctuary, <br />specialty gardens, maintenance yard, and related recreational uses and facilities. <br /> <br />12. Park-and-Ride Commuter Parking Lot - The Pleasanton General Plan delineates several <br />locations within the City, including the Bernal Property, for the future development of <br />park-and-ride lots to serve Tri-Valley commuter ride-sharing and regional transit sys- <br />tems. The only remaining proposed General Plan location along the 1-680 Corridor for <br />a potential lot is on the Bernal Property next to the 1-680jBernal Avenue southbound <br />on-and off-ramps. <br /> <br />13. Public Utilities - A variety of public utilities and related improvements will be needed to <br />facilitate development of the Planning Area. These relate primarily to water, waste- <br />water, flood control, storm water quality, gas and electrical services and communica- <br />tion systems. <br /> <br />14. Trails - Multi-use trails are planned to accommodate leisure walking, jogging, bicy- <br />cling, and access for emergency and open space maintenance vehicles to all major <br />public facilities. Multi-use trails are to connect to regional trails. Secondary trails are <br />to connect the multi-use trails to other pedestrian circulation systems, including side- <br />walks, bicycle lanes, hiking paths, garden paths, etc. <br /> <br />15. Youth jCommunity Center - A complex to facilitate youth and other community social <br />and institutional activities is encouraged to be centrally located adjacent to the Com- <br />munity Park. The youth building should be physically separated from the community <br />building, but parking areas should be shared. The youth center could accommodate <br />City programs as well as private youth club programs. <br /> <br />City youth services might include: programs and special events; food courtjcafe; <br />lounge and meeting space; rooms available for activities such as computer games, <br />music, aerobics and fitness, counseling and classrooms; and access to a large multi- <br />purpose room that might be shared with the community center. <br /> <br />The community center could accommodate adult and family programs as well as <br />rooms for City and community meetings and events. <br /> <br />B3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.