My WebLink
|
Help
|
About
|
Sign Out
RES 06035
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2006
>
RES 06035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2006 4:17:08 PM
Creation date
6/7/2006 4:02:28 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/16/2006
DOCUMENT NO
RES 06035
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Ms. Terry Snyder <br />September 21,2005 <br />Page 2 <br /> <br />o The CMA Board amended the CMP on March 26m, 1998 so that the local jurisdictions <br />are now responsible for conducting the model runs themselves or through a consultant. <br />The Countywide model is available to the local jurisdictions for this purpose. The City <br />of Pleasanton has a signed Countywide Model Agreement with the ACCMA dated <br />December 19, 1999. Before the model can be used for this project, a letter must be <br />submitted to the ACCMA requesting use of the model and describing the project. A <br />copy of a sample letter agreement is available upon request. <br />o If the City chooses to use an alternative model other than the Alameda Countywide <br />Model for traffic impact analysis, then for the purposes of the CMP Land Use Analysis <br />Program, it should be demonstrated that the selected model output traffic volumes are <br />conservative compared with the Alameda Countywide Model, with regard to the MTS <br />roadways that are required to be analyzed. This comparison should be included in the <br />environmental document. <br /> <br />. Potential impacts of the project on the Metropolitan Transportation System (MTS) need to <br />be addressed. (See 2003 CMF Figures E-2 and E-3 and Figure 2). The DEIR should <br />address all potential impacts of the project on the MTS roadway and transit systems. These <br />include 1-580, 1-680, Bernal Avenue, Foothill Road, Sunol Boulevard, Stanley Boulevard, <br />Hopyard Road, Santa Rita Road as well as BART and LAVTA. Potential impacts of the <br />project must be addressed for 2010 and 2025 conditions. <br />o Please note that the ACCMA does not have a policy for determining a threshold of <br />significance for Level of Service for the Land Use Analysis Program of the CMP. <br />Professional judgment should be applied to determine the significance of project <br />impacts (Please see chapter 6 of 2003 CMP for more information). <br />o In addition, the adopted 2003 CMF requires using 1985 Highway Capacity Manual for <br />freeway capacity standards. <br /> <br />. Potential impacts of the project on CMF transit levels of service must be analyzed. (See <br />2003 CMP, Chapter 4). Transit service standard for BART is 3.75-15 minute headways <br />during peak hours. The DEIR should address the issue of transit funding as a mitigation <br />measure in the context of the CMA's policies as discussed below. <br /> <br />. The adequacy of any project mitigation measures should be discussed, On February 25, <br />1993 the CMA Board adopted three criteria for evaluating the adequacy of DEIR project <br />mitigation measures: <br />o Project mitigation measures must be adequate to sustain CMP service standards for <br />roadways and transit; <br />o Project mitigation measures must be fully funded to be considered adequate; <br />o Project mitigation measures that rely on state or federal funds directed by or influenced <br />by the CMA must be consistent with the project funding priorities established in the <br />Capital Improvement Program (CIP) section of the CMF or the Regional <br />Transportation Plan (RTP). <br />The DEIR should discuss the adequacy of proposed mitigation measures relative to these <br />criteria. In particular, the DEIR should detail when the proposed roadway or transit route <br />improvements are expected to be completed, how they will be funded, and what would be <br /> <br />. ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.