Laserfiche WebLink
<br />Draft Environmental Impact Report <br />Bernal Property Phase II Specific Plan <br /> <br />3. Key Project Characteristics, Impacts, and Mitigation Measures <br /> <br />a. Key Project Characteristics <br /> <br />The Phase II Specific Plan site would be devoted to public and quasi-public uses as des- <br />cribed in the Specific Plan (see Chapter 2 and the use descriptions in Appendix B), Potential <br />uses include buildings (such as a cultural arts center, a youth/community center, a child <br />care center, etc,), outdoor facilities (such as sports fields, an amphitheater, roadways and <br />parking, etc.), planted open space (such as the Grand Meadow), and open space main- <br />tained in a more "wild" condition (such as the corridor of the Arroyo de la Laguna), <br /> <br />Figure 14 presents the Plant Community Conceptual Plan from the Phase II Specific Plan, <br />As shown in Figure 14, a suite of restored natural plant communities, typical of what once <br />may have existed on this site, is proposed for planting in the open space areas, If restored <br />as shown, these areas could provide valuable habitat for many of the native wildlife species <br />known from the project vicinity, <br /> <br />Although a substantial acreage ofthe site (at least 100 acres) would remain in open space <br />under the Specific Plan, some of that acreage would be subject to grading and replanting <br />and, therefore, would be subject to disturbance of any biological resources present. <br /> <br />Other considerations that necessitate consideration of the potential for impacts on biologi- <br />cal resources include (1) the subsequent construction of flood control storm water deten- <br />tion basins that were not identified as potential habitat in the 2000 EIR and (2) changes in <br />regulatory standards since 2000 (e,g" listing of and critical habitat for the CTS and re- <br />proposal of critical habitat for the CRLF), <br /> <br />The mitigation measures imposed under the earlier EIR and any measures imposed under <br />this document would fulfill the City's obligations under CEQA with respect to biological <br />resources, However, development activity within the project site may require one or more <br />permits from state and and/or federal resources agencies, Those permits may impose miti- <br />gation requirements that could differ from, and/or be greater than, the mitigation measures <br />established in the earlier EI R and this document. <br /> <br />b. Significance Criteria <br /> <br />Significance criteria for impacts on biological resources are drawn from CEQA Guidelines <br />Appendix G (Items IV (a) through (e) (Item IV (I) does not apply in the absence of an <br />adopted Habitat Conservation Plan or other conservation plan) and Item XVII (a), Impacts <br />on biological resources would be significant: <br /> <br />(1) [Ifthe project would] have a substantial adverse effect, either directly or indirectly <br />or through habitat modification, on any species identified as a candidate, <br />sensitive, or special status species in local or regional plans, policies, or <br />regulations, or by the CDFG or USFWS; <br /> <br />62 <br />