Laserfiche WebLink
<br />Draft Environmental I mpact Report <br />Bernal Property Phase II Specific Plan <br /> <br />. Program 5.4: Require technical review and analysis of geotechnical studies by a <br />qualified consulting geotechnical engineer reporting to the City, Incorporate the <br />recommendations of the City's consulting engineer into the project design. <br /> <br />. Program 5,5: Permit development in areas with a "high" susceptibility to geologic <br />hazards only when geologic and soils investigations demonstrate that hazards can be <br />mitigated by accepted engineering and construction techniques, Mitigation measures <br />identified by the investigations shall be incorporated into the project design and <br />subject to approval by the City's reviewing geologist/engineer. <br /> <br />In addition, much of the topsoil at the site is a high quality growing medium, If not properly <br />managed, these potentially productive topsoils could be lost during grading operations, <br />However, the Specific Plan includes measures that require grading projects to segregate and <br />save topsoils for reuse in areas to be revegetated, <br /> <br />No adverse environmental impacts relating to adverse soil conditions would occur because <br />the Specific Plan contains adequate provisions to mitigate these potential impacts, <br /> <br />d. Mitigation Measures <br /> <br />No significant effects on geology, soils, and seismicity have been identified; therefore, no <br />mitigations are needed, <br /> <br /> <br />1. Framework for Analysis <br /> <br />This section assesses the public health and safety effects of the proposed project based on <br />review of the Bernal Property Phase I Specific Plan EIR, an online records review for <br />hazardous materials, and a site reconnaissance conducted in October, 2005, <br /> <br />2. Setting <br /> <br />The setting of the Plan Area was described in the Bernal Property Phase I Specific Plan EIR <br />and that setting discussion covered the proposed Phase II area, This section provides an <br />update ofthe setting addressed in the 1997/2000 EI R as it relates to hazardous materials in <br />and near the proposed Plan Area. <br /> <br />76 <br />