Laserfiche WebLink
<br />The Dublin San Ramon Services District currently monitors sewage effluent. The treatment plant <br /> <br />produces secondary effluent which is pumped to San Francisco Bay, tertiary effluent which is used <br /> <br /> <br />primarily for landscape watering in commercial areas, and sludge which is decomposed and then <br /> <br />buried nearby. The District monitors secondary effluent on a daily basis and monitors the sewage <br /> <br />transport system for pH levels (a measure of acidity or alkalinity) and hydrogen sulfide. At its sewage <br /> <br />ponds site the District operates numerous test wells that have shown no toxic material intrusion on the <br /> <br />soil content. See Wastewater in the Public Facilities Element for additional discussion of wastewater <br /> <br />treatment. <br /> <br />Stormwater Runoff <br /> <br /> <br />Historically, the City has focused stormwater runoff management efforts on reducing downstream <br /> <br />flooding risks by providing storm-drain systems in developed areas. However, stormwater runoff also <br /> <br />carties urban pollutants, which create water-quality problems in downstream water bodies and which, <br /> <br />in turn, impact aquatic life and the overall ecosystem health. <br /> <br />Because the Federal Clean Water Act requires municipalities to implement stormwater management <br />programs, the City prepared the Phase I Storm Water Program in 1989 and Phase II program in 200l. <br />To protect water quality, municipalities - under new established rules - must obtain a National <br />Pollution Discharge Elimination System (NPDES) pennit for developing and implementing a <br />stormwater management program. The stormwater management program must include the following <br />"control measures" for reducing the quantity of pollutants that stormwater picks up and carries into <br />the stormwater system: Public Education and Outreach, Public Participation/Involvement, Illicit <br />Discharge Detection and Elimination, Construction Site Runoff Control, Post-Construction Runoff <br />Control, and Pollution Prevention / Good Housekeeping. These control-measure programs target <br />reducing stormwater pollution in storm-drain systems and creeks, which eventually flow into water <br />bodies including the San Francisco Bay. <br /> <br />To implement Phase I and II rules under the Clean Water Act, Alameda County established a <br />county-wide water program to guide cities in establishing "control measure" programs. The City of <br />Pleasanton actively participates in this program and has joined other Bay Area communities in <br />implementing the clean water runoff pennit provisions. <br /> <br />The City recognizes that new stormwater quality controls and development requirements may add cost <br /> <br />to development projects and business operations. Therefore, as development occurs, Pleasanton is <br /> <br />attempting to balance the objectives of meeting clean-water program mandates utilizing biological <br /> <br />methods - such as vegetated swales and bio-retention ponds - along with encouraging economic <br /> <br />development and business retention. <br /> <br />See the Public Facilities Element discussion of stormwater drainage and flood control facilities along <br />with related policies and programs. As discussed therein, Zone Ts Stream Management Master Plan <br /> <br />3 Con OS Element, CC 082906, clean <br /> <br />VII-13 <br /> <br />City Counci18/29/2006 <br />