Laserfiche WebLink
<br />school-aged children going to/from Mohr Elementary School. The consensus of the Bass <br />Homes neighbors previously speaking on the sidewalk appears to oppose the sidewalk. Several <br />neighbors suggested placing the sidewalk connection between the Selway, Lai, and Blaine prop- <br />erties, linking Street "A" to Martin Avenue. However, representatives of the Pleasanton Police, <br />Public Works/Engineering, and Planning Departments believe that the pedestrian connection, if <br />provided, should be placed on Cameron Avenue. <br /> <br />Trip Generation. Traffic Analysis. and Mitigation Measures <br /> <br />The proposed project wi\1 generate 23 a.m. peak hour trips and 24 p.m. peak hour trips. Pro- <br />gram 2.2 of the Circulation Element of the Pleasanton General Plan states, <br /> <br />"Require site-specific traffic studies for all major developments which have the <br />potential to Level Of Service "D", and require developers to implement the miti- <br />gation measures identified in these studies" <br /> <br />A traffic study was completed for the proposal analyzing the "ExistinglBaseline/Approved" sce- <br />nario and is attached. It is attached. Since the proposed project is consistent with the Land Use <br />Element of the Pleasanton General Plan, thereby not requiring an amendment to the General <br />Plan, a build-out analysis was not required. <br /> <br />The results of the analysis indicate that the Santa Rita Road/Stoneridge Drive intersection oper- <br />ates at LOS "E" for the p.m. peak hour: the total vehicle delay is 59 seconds. The proposed <br />project will add 22 p.m. trips to this intersection and requires mitigation to obtain an acceptable <br />LOS "D". The construction of a new southbound right-turn lane at this intersection wi\1 be in- <br />cluded in the traffic impact fee update study to be conducted by the City next year. This mitiga- <br />tion is needed with/without this development as the combined traffic from all approved devel- <br />opment projects produces the LOS "E" condition. This mitigation would bring the LOS at this <br />intersection into conformance with City's LOS "D" standard. Because this mitigation is consid- <br />ered to be a City-wide responsibility, the project developer's payment of City and Tri-Valley <br />Traffic Impact Fees is considered to be its mitigation, and wi\1 be conditioned of this project. <br /> <br />The Mohr Avenue/Santa Rita Road intersection wi\1 experience an increase of 17 trips in the <br />a.m. peak hour and 21 trips in the p.m. peak hour. While this intersection does operate at an ac- <br />ceptable level of service in both a.m./p.m. peak hours with the additional trips generated by the <br />proposed project, the increase in the westbound volume creates delay for the eastbound and <br />westbound left-turn movements. It is recommended that this applicant be conditioned to modify <br />this intersection's signal timing to provide a protected/permissive left turn phasing for the east- <br />bound/westbound approaches prior to the occupancy of the project. This signal modification <br />wi\1 reduce the overall delay at the intersection and provide added safety during the peak hours. <br />The applicant has agreed to this mitigation which is reflected in the conditions of approval. <br /> <br />Item 6.e.. PUD-50 <br /> <br />Page 13 of29 <br /> <br />June 28, 2006 <br />