<br /> Existing + Project (Assumes <br />Roadway Existing Conditions 100% of project traffic uses each <br /> roadway <br />Residential Collector Dailv I Peak I LOS Dailv I Peak I LOS <br />Kamp Drive 1,664 I 157 I A 1,914 I 181 I A <br /> <br />The number of project trips projected to use these residential streets/collectors would not change <br />the level-of-service and, therefore, would be compatible. The 24 trips generated by the pro- <br />posed project in the p.m. peak hour represent less than one additional car every two minutes. <br /> <br />Cameron Avenue Reconstruction <br /> <br />Cameron Avenue will be completed across the entire project frontage to a pavement width of28 <br />feet, curb-to-curb, except for the Leuthauser and Ketell properties where it will be 26 feet in <br />width. The 26-foot pavement width results from constructing the proposed sidewalk along the <br />Leuthauser and Ketell without having to encroach onto their properties. As a traffic calming <br />measure, Cameron Avenue will be reconstructed by Ponderosa Homes with a curvilinear align- <br />ment as shown on the proposed development plan replacing the present straight alignment. The <br />City will abandon the unneeded street right-of-way on the south side of Cameron Avenue, the <br />area between the existing and new curb locations, and then offer the surplus right-of-way to the <br />south side property owners for incorporation into their front or side yards. <br /> <br />Public Works/Engineering has reviewed the present straight alignment of Cameron Drive as <br />wells as the proposed curvilinear design suggested by the Planning Commission and has deter- <br />mined that both options are safe and consistent with good engineering judgment. <br /> <br />No land will be required from the Dillon, Lawer, Sussman, Grimes, Herb, Leuthauser, and <br />Ketell properties to accommodate the proposed realignment. All construction will use a portion <br />of the existing Cameron Avenue street right-of-way augmented by land dedicated to the City <br />from the project site. In 1987 Bass Homes received approval by the City to construct a 29-unit <br />subdivision located in the Mohr A venue, Martin Avenue and Cameron Avenue area with private <br />streets. Since the original approval, Bass Homes requested the City accept these streets as pub- <br />lic streets. The City Council approved the Bass Homes request subject to conditions of ap- <br />proval. One of those conditions required that Bass Homes obtain all of the necessary grant- <br />deeds for the street right-of-way from the residents having legal ownership of the streets within <br />the Bass Homes development. In 1988, after receiving the deeds for the purpose of street right- <br />of-way for Equestrian Drive, Nichole Avenue, Courtney Avenue and Diablo Court, the City ac- <br />cepted those streets as public streets and incorporated them into the City's public street system. <br /> <br />Therefore, based upon the evidence presented to the City Council in 1988, the City has all the <br />street right-of-way necessary for Cameron Avenue. The applicant's engineer and staff have re- <br />viewed the grants of right-of-way for Cameron Avenue and have determined there is sufficient <br />right-of-way to construct a 4.5-foot wide sidewalk along the northerly side Cameron Avenue if <br />the street is reduced to 26 feet by the Leuthauser and Ketell properties. Based upon this evi- <br /> <br />Item 6.e., PUD-50 <br /> <br />Page 15 of29 <br /> <br />June 28, 2006 <br />