<br />Marion Pavan <br />Page 2 <br /> <br />July 12, 2006 <br />ROOll <br /> <br />lb. Debris Flow HazardlFlooding - To address tPis issue, BGC performed <br />additional aerial photographic analyses, and reviewed pertinent subsurface <br />information in their files. Aerial photographic base maps were used to show <br />potential debris flow source areas and run-out paths. Based on this additional <br />work, BGC does not believe debris flows have the potential to affect the <br />proposed development. With respect to flooding, BGC states, "We doubt the <br />southern and northern drainages pose a flooding hazard to adjacent proposed <br />building pads..." BGC indicates that the project civil engineer should address <br />the flooding hazard for the central drainage. <br /> <br />CSA Comment - The Project Geotechnical Consultant has adequately addressed <br />the debris flow issue. We recommend that prior to final approval of the lot <br />configuration and grading plan, the Project Civil Engineer address the potential <br />for flooding of the proposed building pads from the adjacent drainages based on <br />the latest grading plan. <br /> <br />2a. Retaining Walls - BGC recommends that cantilever walls be used instead of <br />modular block walls if the proposed streets or driveways would be located <br />closer to walls than two wall heights. <br /> <br />CSA Comment - We agree with the use of cantilever walls instead of modular <br />block walls near important facilities, however, this recommendation does not <br />include buildings, only streets or driveways. Also, if the terrain behind the wall <br />is level, this results in a 2H:1 V setback line from the base of the wall to the <br />street/driveway. However, if the terrain is sloped, a 2H:1V line from the base of <br />the wall would intersect the facility. We recommend approval if the wording is <br />changed such that cantilever walls will be used if buildings, streets or driveways <br />are within an imaginary 2H:1V line extending from the base of the wall, <br /> <br />2b. Lot Drainage and Downspouts - BGC recommends that concrete lined v.ditches <br />be provided at the tops of graded slopes, and at the base of slopes adjacent to <br />streets or driveways, BGC also indicates that future lot-specific geotechnical <br />engineers should be responsible for providing recommendations for roof <br />downspouts, drainage gradients away from homes and suitable locations for <br />disposal of collected water. <br /> <br />CSA Comment - As conditions of building permit approval, we recommend that <br />consideration be given to requiring all downspouts to be collected in tightline <br />pipes and that geotechnical recommendations are provided for drainage <br />gradients away from homes, and that drainage discharge be in suitable locations <br />on an individual lot basis. <br /> <br />COTTON, SHIRES & ASSOCIATES, INC. <br />