Laserfiche WebLink
<br />The following table compares the proposed master plan with the previously approved 1998 <br />master plan: <br /> <br /> <br />Existing Building Area: <br /> <br />Existing Building Area: No change <br /> <br />. Buildings A and B (Chapel/Parish Office) = <br />11,165 sq. ft. <br /> <br />. Building E (Sanctuary) = 14,725 sq. ft. <br /> <br />Future Building Area: <br /> <br />Future Building Area: <br /> <br />. Building C (Classrooms) = 13,920 sq. ft. <br /> <br />. Building D (Parish Center with Gym) = 22,296 <br />sq. ft. <br /> <br />. Building D (Multi-purpose & Gym) = 11,900 <br />sq. ft. <br /> <br />. Building E (Elementary School) = 25,000 sq. ft. <br /> <br />. Building F (Elementary School) = 25,000 sq. ft. <br /> <br />. Building F (Rectory) = 4,860 sq. ft. <br /> <br />. Building G (Rectory) = 4,860 sq. ft. <br /> <br />Total Buildin Area Buildout: 81,570 s . ft. Buildout: 78,046 s . ft. <br />Existin Parkin : 311 s aces 3 II s aces <br />Future Parking: 113 spaces 113 spaces <br /> <br />Buildout Parking: 424 spaces 424 spaces <br /> <br />The approved master plan indicated 435 spaces at buildout. However, because II fewer parking spaces <br />currently exist on site compared to the 322 spaces that were shown on the 1998 master plan, staff reduced the <br />buildout parking figure by II spaces. <br /> <br />The church would like to start construction of the parish center building in the spring of2007. <br />Plans for the elementary school and rectory buildings have not been included as part of this <br />application and would be subject to separate City approvals at a later date (conditional use <br />permit and design review approvals for the elementary school and design review approval for <br />the rectory building). The church is uncertain when the application(s) for the elementary school <br />and rectory buildings would be submitted to the City. <br /> <br />Parking <br /> <br />Users of the proposed parish center building would utilize the existing parking lots, which <br />currently have a total of 311 spaces. The proposal would eliminate 20 spaces to create a drop- <br />off area in front (east side) of the parish center and to create a pedestrian pathway through the <br />existing parking lots. The applicants would replace all 20 of these spaces by restriping some of <br /> <br />PDR-561/PV-158 <br /> <br />Planning Commission <br /> <br />Page 5 <br />