My WebLink
|
Help
|
About
|
Sign Out
23
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
011607
>
REGULAR MEETING
>
23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2007 12:07:47 PM
Creation date
1/11/2007 3:15:10 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
1/16/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
23
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />practice courts across the gym. Three-level bleacher seating for up to 85 people would be <br />located along a portion of western gymnasium wall. A 264-seat conference room would be <br />located at the northern end ofthe building. Other rooms include a kitchen, several meeting <br />rooms, youth room, nursery, storage rooms, and restrooms. Although not needed for the <br />church's activities, the church is proposing to install three women's and three men's showers to <br />allow the building to be used as an emergency shelter. Entry and regular (non-emergency) <br />exiting from the building would generally occur on the east (parking lot) side ofthe building. <br /> <br />Outside activities would be limited to a small fenced play area without play equipment on the <br />east side of the building that would be used for the nursery during services and a patio area at <br />the northwestern comer of the building that would be used as a break or refreshment area during <br />events in the main conference room. There would be no outdoor basketball practice. <br /> <br />The contemporary styled building contains architectural elements similar to the existing church <br />building. A feature unique to the proposed building is the eastern and western gymnasium <br />walls, which would tilt inward at the top and slightly undulate in and out and up and down. The <br />parish center would utilize the same brown- and tan-colored split-face concrete block and stucco <br />materials/colors of the existing sanctuary building. The existing sanctuary building has a <br />standing-seam copper roof. Due to stormwater quality concerns, copper materials are no longer <br />desired in new construction. Therefore, the applicants are proposing to utilize a brown-colored <br />standing-seam metal material on the sloped roofs that is similar in color to the existing oxidized <br />copper roof. The standing-seam material would also be utilized on the eastern and western <br />gymnasium walls and northern conference room wall. A color/materials board will be available <br />at the hearing. The parish center building would have maximum height of 34 feet at the top of <br />the gymnasium walls. This height requires a variance from the required 30-foot maximum <br />height. <br /> <br />Existing Trees and Tree Removal <br /> <br />A tree survey and analysis for this project site has been prepared by HortScience, Inc. The <br />report describes the species, size, health, and location of the existing trees near the proposed <br />parish center building and also recommends special precautions necessary for trees worth <br />preserving. There are 12 existing trees over six inches in diameter near the proposed <br />development, including two of which are defined as "Heritage Tree" by the Municipal Code <br />(i.e., a tree which measures 35 feet or greater in height or which measures 55 inches or greater in <br />circumference). The 10 non-heritage trees are located along the western end of the existing <br />parking lot and were planted at the time the parking lot was installed. These healthy trees vary <br />from six to seven inches in diameter and are Deodar cedar and London plane species. The <br />arborist recommends that these trees be removed due to their location within the proposed area <br />of development. A heritage-sized English walnut tree is located just north of the church's <br />driveway offRheem Drive. The walnut tree is in poor health and the arborist recommends that <br /> <br />PDR-561/PV-158 <br /> <br />Planning Commission <br /> <br />Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.