Laserfiche WebLink
<br />Neighbors had also questioned if the church could locate the parish center building on the <br />eastern portion of the church property. The church indicated that it originally considered <br />keeping the parish center building on the eastern side of the site where the classroom and multi- <br />purpose/gymnasium buildings were shown on the 1998 master plan, but decided against it as the <br />western location allows the existing parking lots to be shared by both the existing <br />chapeUsanctuary building and the proposed parish center building and the church wouldn't need <br />to construct new parking lots. The church also indicated that relocating the elementary school <br />building from the west side of the site to the east side ofthe site as proposed would allow it to be <br />located further away from the existing residences to the south. <br /> <br />Regarding site coverage, the Agriculture District does not have a maximum Floor Area Ratio <br />(FAR). The proposed 48,186 square feet of building area with the current development phase <br />and 78,046 square feet of building area at buildout of the church site would result in 9.2% and <br />14.8% FARs on the 12.07-acre site, respectively, both of which are considered very low FARs. <br />Staff finds the site coverage to be acceptable. <br /> <br />Overall, staff believes that the proposed parish center building has been appropriately located on <br />the site and that there will be adequate separation between the building and the surrounding <br />properties. <br /> <br />Architecture/Design <br /> <br />Statfbelieves that the proposed parish center building is attractive and contains design features <br />which add interest to the elevations. The colors and materials of the building will complement <br />the building architecture and would match the existing sanctuary/chapel building on the site, <br />with the exception of the existing copper roof material that has been substituted with a similar- <br />looking metal roof material to address stormwater concerns. In general, staff believes that the <br />proposed building would be an attractive and compatible addition to the neighborhood. <br /> <br />Although a height variance is required for the building to exceed the 30-foot height limit by four <br />feet, staff believes that the building mass has been minimized as a result of the side gymnasium <br />walls angling in towards the top and because the taller side walls don't wrap around to the front <br />and rear of the gymnasium. The gymnasium walls would also slightly undulate in and out and <br />up and down to add interest and reduce the mass of the building compared to a flat building <br />wall. Additionally, the 34-tall gymnasium walls would be located along a llO-foot long portion <br />of the approximately 302-foot long building. The remainder of the building would be well <br />below the 30-foot height limit with only the very top ridge ofthe roof over the conference room <br />reaching a maximum height of 29 feet 3 inches. <br /> <br />As noted earlier, the specific design of the future elementary school and rectory buildings would <br /> <br />PDR-561/PV-158 <br /> <br />Planning Commission <br /> <br />Page 11 <br />