Laserfiche WebLink
<br />hour traffic problems in the area. <br /> <br />Traffic for the buildout of the church's 1998 master plan was included in the City's traffic <br />model. Also, the proposed master plan modification would reduce the total square footage of <br />the master plan by 3,524-square feet. Therefore, no traffic report is required for the proposed <br />parish center building. <br /> <br />The church site currently has one improved access drive off Stoneridge Drive and one off <br />Rheem Drive leading to the two parking areas. The applicants would not modify the existing <br />driveways. The western parking lot currently has a gate located at both of its entries. A <br />condition of approval from the 1998 master plan required that these gates be installed and that <br />the parking lot be gated when it was not needed for church parking. With the current <br />application, staff believes that this requirement should remain in order to prevent people from <br />parking in the lot late at night and potentially disturbing the neighbors. Staff has included a <br />condition of approval to address this item. <br /> <br />As previously noted, residents in the Pleasant Village neighborhood had requested that the City <br />install centerline striping along Rheem Drive between Stoneridge Drive and Kamp Drive in <br />order to define/narrow the travel lanes and reduce speeds and to install centerline striping along <br />the "S-Shaped" turn at Rheem Drive/Bowen Street/Alexander Way/Krause Street in order to <br />deter vehicles from "cutting the corners." The City Traffic Engineer believed the striping to be <br />an acceptable tool to try to reduce speeds on Rheem Drive and to deter traffic from making <br />dangerous turns, and authorized the striping projects. The striping, consisting of two centerlines <br />with reflectors, will be installed by the City either this winter, weather permitting, or next <br />spring, well before the parish center building would be completed. In addition, Pleasant Village <br />residents also indicated that on Sundays after the church services let out, the northbound left turn <br />lane at the Rheem Drive and Stoneridge Drive intersection can get congested as the signal only <br />lets a few cars turn left from Rheem Drive to Stoneridge Drive. The City Traffic Engineer has <br />indicated that the signal timing will be changed on Sundays to allow more vehicles to make this <br />left-turn movement. <br /> <br />Some neighbors have requested that the church's existing Rheem Drive driveway be relocated to <br />the north along Rheem Drive or along Stoneridge Drive. As originally proposed by the church <br />with the 1998 master plan, the driveway to the proposed western parking lot was located at the <br />southern boundary of the church property at the "elbow" where Bowen Street and Alexander <br />Way intersect. However, due to concerns by the neighbors, it was relocated to its present <br />location on Rheem Drive. Demolishing the existing driveway and constructing a new driveway <br />on Rheem Drive closer to Stoneridge Drive would reduce the driveways efficiency at delivering <br />traflic to the Rheem Drive/Stoneridge Drive intersection, possibly require that the parish center <br />building be redesigned as two separate buildings, and possibly result in a new building being <br />located closer to the Bowen Street residents than is currently proposed unless the church was to <br /> <br />PDR-561/PV-158 <br /> <br />Planning Commission <br /> <br />Page 14 <br />