Laserfiche WebLink
<br />residences during Sunday services." The church has agreed to install the signs. <br /> <br />A neighbor had inquired about implementing residential parking permits to prevent church <br />patrons from parking within the Pleasanton Village neighborhood. Staff feels that measures <br />should be taken to ensure parking would not overflow onto adjacent residential properties rather <br />than rely on permit parking, which can be inconvenient for the residents and their guests. As <br />noted above, staff feels that on- and off-site parking would be sufficient to accommodate the <br />church's peak parking demand during Sunday services. Furthermore, in order to reduce the <br />attractiveness of off-site parking along the adjacent residential streets to the south, staff is <br />recommending that the church install a five to six-foot tall fence in its southern planter area near <br />the "elbow" of the Bowen Street and Alexander Way intersection to prevent people from using <br />this "short cut" to reach the church. Staff believes that a fence would be more effective than the <br />church's proposal to install landscaping to block the short cut. The church has agreed to install <br />the fence. <br /> <br />At the neighborhood meeting, a neighbor questioned if parking could be prohibited along the <br />Rheem Drive frontage ofthe church site. Staff believes that on-street parking should remain <br />permitted along the church's Rheem Drive frontage in order to reduce the chances of <br />parishioners being "forced" to park further south on Rheem Drive in front of the residences. <br /> <br />With the additional on-street and off-site parking discussed above, staff believes that there <br />would be adequate parking to meet demand for this phase of the church's development. In <br />addition, because the site is governed by a conditional use permit, the applicants can be required <br />to mitigate future parking problems, should they arise. However, if the Commission feels that <br />the church should install additional parking on their site rather than rely on a parking agreement <br />for off-site parking and/or on-street parking in front of the church site, then the Commission <br />should modify the staff-recommended conditions of approval accordingly. <br /> <br />With regard to buildout of the master plan, two future parking lots, totaling 113 spaces, are <br />shown at the eastern side of the site, matching the parking shown in the prior 1998 master plan, <br />resulting in a total of 419 spaces at buildout (this figure includes the staff recommendation to <br />eliminate the five parallel parking spaces). Since no details on the future elementary school and <br />rectory have been provided with the current application, the exact number of parking spaces that <br />would be required for buildout would be determined when the future elementary school and <br />rectory are proposed. In addition, similar to the 1998 master plan, the revised master plan shows <br />access to the future parking lots via the existing circular church parking lot and a new driveway <br />off Oakland Avenue. Access to the future parking lots are not being approved as part of the <br />subject application, but would be determined when the future elementary school and/or rectory <br />are proposed. Staff anticipates that the Oakland Avenue driveway may receive neighborhood <br />opposition and it may be necessary to relocate this driveway. <br /> <br />PDR-561/PV-158 <br /> <br />Planning Commission <br /> <br />Page 18 <br />