Laserfiche WebLink
GEOTECHNICAL STUDY SUMMARY <br />PROPOSED VINEYARD PASS SUBDIVISION <br />865 CLARA LANE <br />PLEASANTON, CALIFORNIA <br />The following report was prepared for Vineyard Pass, LLC for the proposed Vineyard Pass <br />Subdivision to be located on 865 Clara Lane in Pleasanton, California. Based on our geotechnical <br />study, it is our opinion that the site may be developed for the proposed project. <br />The contents of this report have been brief/y summarized be%w for your convenience; however <br />the use of the summarized information without first reviewing the entire contents of the fo/%wing <br />report is not recommended. Based on our geotechnical study, we present the following <br />summarized discussions and/or recommendations: <br />SUBSURFACE CONDITIONS <br />• Undocumented fill was encountered to a depth of 5 feet below existing grade in the borings <br />at the time of drilling. There may be varying depths of fill in areas beyond or between our <br />exploratory borings. <br />In general, the native soils consisted of stiff to very stiff silty clay and gravelly clay and <br />medium dense to very dense clayey sand and silty sand . Laboratory testing indicates that <br />the near-surface soils have a moderate expansion potential. Groundwater was not <br />encountered in borings at the time of drilling. We expect groundwater levels to fluctuate <br />due to variations in rainfall, groundwater recharge, and site conditions. <br />SITE PREPARATION <br />• The existing undocumented fill should be excavated and recompacted as shown in Figure <br />9, Typical Buttress and Subdrain. The fill limits shown on Figure 7 are approximate. Our <br />representative should be present during grading to observe that all undocumented fill in the <br />building pad areas has been excavated and recompacted. Compaction recommendations <br />are discussed in Section 6.1.4 Fill Placement and Compaction. <br />• We recommend that the subgrade soils for floor slabs, if used, and exterior flatwork be a <br />r replaced with 12 inches of non-expansive compacted fill, Class 4 material or an approved <br />equivalent placed on moisture-conditioned, compacted fill. The non-expansive fill should <br />extend at least 2 feet beyond the and exterior area. <br />On-site soil generated by site grading may be used as structural fill provided the soil is free <br />of deleterious and organic materials and is approved for use as fill by our representative. <br />The on-site soils should be moisture-conditioned, and compacted to a minimum of 90 <br />percent relative compaction at a minimum of 2 percent over the optimum moisture content <br />according to the latest ASTM test methods and procedures. <br />All import fill to be placed must be compacted to a minimum relative compaction of 90 <br />percent of the maximum dry density and moisture-conditioned to a minimum of 2 percent <br />over the optimum moisture content according to ASTM test methods. <br />The upper 12 inches of pavement subgrade soils should be scarified, moisture-conditioned <br />as necessary, and recompacted to a minimum of 95 percent relative compaction. <br />FOUNDATIONS <br />• If the earthwork recommendations included in this report are complied with, the proposed <br />residences may be supported by a pier and grade beam foundation established in native soil <br />and/or engineered fill. The recommended allowable skin friction capacity is 500 pounds per <br />square foot (psf) for native soil/engineered fill. Lateral load recommendations are given in <br />Section 6.3. The foundation should be designed according to the criteria presented in Table <br />3. <br />y~,orbmacher Engineering, Inc. <br />