My WebLink
|
Help
|
About
|
Sign Out
16 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
030607
>
16 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2007 8:45:53 AM
Creation date
2/28/2007 4:30:56 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/6/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
16 Attachments
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project No. JB-569 <br />20 June 2006 <br />Revised 18 October 2006 <br />Page 6 <br />6.0 RECOMMENDATIONS <br />6.1 Earthwork <br />6.1.1 General <br />As previously stated, final grading plans were not available during preparation of <br />this report. We recommend that final grading plans be reviewed by our office <br />prior to starting the grading operations. <br />The existing undocumented fill should be excavated and recompacted as shown <br />in Figure 9, Typical Buttress and Subdrain. The fill limits shown on Figure 7 are <br />approximate. As discussed earlier, the fill limits should be explored by trenching <br />~ ' to help determine the extent and depth of the fill. Our representative show/d be <br />present during grading to observe that all undocumented fill in the building pad <br />f areas has been excavated and recompacted. Compaction recommendations are <br />f discussed in Section 6.1 .4 Fill Placement and Compaction. <br />We recommend that the subgrade soils for floor and garage slabs, where used, <br />and exterior flatwork be replaced with 12 inches of non-expansive compacted fill, <br />Class 2 material or an approved equivalent placed on moisture-conditioned, <br />compacted fill. The non-expansive fill should extend at least 2 feet beyond the <br />floor and garage slab areas and exterior flatwork. <br />We understand that a septic tank system may be located on the property. <br />Information regarding the system should be forwarded to our office when <br />available for review so that we may determine whether the system needs be <br />removed. <br />6.1.2 Site Clearing <br />All grading must be observed by our representative. It is especially important that <br />our representative be present during the demolition, stripping and scarification <br />process to observe whether undesirable materials are encountered. Loose, soft, <br />uncontrolled fill, or disturbed native soils must be removed from all structural <br />areas, beneath adjacent walks and slabs, beneath areas to receive fill, and <br />beneath areas to be paved. Excavations must extend at least 5 feet beyond the <br />structure and slab areas, if practicable. The term uncontrolled fill refers to any <br />existing fill that was not properly inspected or tested by an engineering firm. <br />As previously stated, any uncontrolled fill at the site should be removed in <br />accordance with our recommendations. If testing and observation documentation <br />exists for suspected undocumented fill, the documentation should be forwarded <br />Korbmacher Engineering, Inc. <br />.~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.