perpendicular parking with standard parking stall sizes. The circulation would be two-way <br />throughout the site. <br />Ms. Decker then displayed and described the landscaping plan and Master Plan renderings. She <br />displayed the elevations, floor plans, and material treatments for the plan. She noted that the <br />proposed architecture was compatible with the existing buildings. She advised that in all cases, <br />the f ndings for all the alternatives and elements could be made. <br />Ms. Decker noted that there had been neighborhood concerns about the expansion of any of the <br />Golden Road parking area, which was addressed in the staff report. The neighbors had proposed <br />an idea to relocate the permanent building out of the 1999 Master Plan location and the proposed <br />Master Plan location and move it to where the temporary buildings were; this would allow the <br />continued use of the parking area off of Del Valle Parkway. She noted that the neighbors also <br />felt that relocating the building would allow connecting the two parking areas, similar to some <br />degree to that shown on the 1967 plan. <br />Ms. Decker stated that staff did examine the connection of the two parking areas, and there was <br />concern, as there was in 1999, regarding the need for and safety of such apass-through. She <br />noted that in 1999, the Fire Department had required a connection that now was no longer <br />required. She added that it was currently bollarded. She noted that the functionality and use of <br />Sunshine Preschool could possibly be disrupted; the scope of program of the preschool would be <br />changed, and one or both of the temporary structures may be required to be removed. She noted <br />that not all of the preschool would be held in the parish center. Staff was concerned that an <br />amenity to the community may be lost and that the majority of the program may be required to <br />be closed during the year-long construction. This third alternative was not embraced by the <br />Church at this time as there were grave concerns that nearly 200 families would be affected with <br />potentially no close alternative for child care. She noted that the proposed permanent structure in <br />the proposed location would maintain the Sunshine Preschool wholly, without disruption or <br />changes to licensure or facilities. <br />Ms. Decker noted that staff believed that the able to make the conditional use permit findings <br />could he made for any combination of any particular design. She acknowledged that the <br />previous November 8, 2006 staff report had provided a reconunendation for the proposed Master <br />Site Plan, which depicted 122 parking spaces. Staff believed it was a viable plan which was <br />consistent with the 1999 plan. Staff did not believe there was any real benefit to Alternative A, <br />which provided an increased buffer area reducing the parking to 98 spaces, would bring more <br />cars onto the street. <br />Ms. Decker reflected that this project has undergone extensive communication among the <br />applicant, staff, and the neighborhood in looking for compromises regarding the issues and <br />concerns of this site. She advised that no funding was available for mediation for this project. <br />She believed that the project planner has done an excellent job in meeting with the community. <br />She wished to publicly commend the conmlunity for coming forward and working with the <br />applicant during this year-long process; she believed there was a sincere effort during this <br />process to find a compromise. Staff recommended that the Planning Commission consider the <br />merits of the proposal and take action on this project. <br />EXCERPTS: PLANNING COMMISSION MEETING M[NUTES, January 24, 2007 Page 2 of 12 <br />