My WebLink
|
Help
|
About
|
Sign Out
18 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
051507
>
REGULAR MEETING
>
18 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2007 11:14:37 AM
Creation date
5/11/2007 11:56:43 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
5/15/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
18 Attachments
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 6: Development Standards and Project Conformance <br />Development Standard Development Proposal <br /> Plan <br />Floor Area Ratio 100% 22.8% <br />Stanley Boulevard Euilding Setback 10 feet 45 feet to Longs Drugs <br />" <br />" <br /> 50 feet to Stores <br />A <br />Stanley Boulevard Landscape Area Setback 10 feet 25 feet to 30 feet at Longs Drugs <br />" <br />" <br /> 40 feet at Stores <br />A <br /> 40 feet to Longs Drugs <br />East Property Line Building Setback 10 feet 60 feet to Home Depot <br /> 1 I 0 feet to the Garden Center <br />East Property Line Landscape Area Setback I 0 feet I 0 feet to 15 feet <br />adjoining the PG & E substation property <br />Nevada Court Building Setback 10 feet 50 feet at the Garden Center <br /> l 15 feet to the south property line <br /> l0 feet to Nevada Court <br />Nevada Court Landscape Area Setback 10 feet 35, 40, and 60 feet to the south prop- <br /> erty line <br />Bernal Avenue Building Setback 10 feet 35 feet Co Stores "B" <br />" <br />" <br /> 45 feet to the <br />Pad <br />building <br /> I S feet to parking <br />Bernal Avenue Landscape Area Setback 10 feet 30 feet at the "Pad" building <br /> 35 feet at Stores `B" <br />Note that these setbacks and separations are measured from the back of the monolithic side- <br />walk shown on the site plan and were done this way as point of reference. While the setback <br />separations would be less due to the separated sidewalk, the net landscape area will not be af- <br />fected because of the planting area between the curb and walk. <br />PUD Maior Modification <br />The Stanley Business Park designated specific construction-oriented businesses, automotive <br />uses, etc., which conditionally allowed uses by the C-S District, as permitted uses. Limited re- <br />tail and personal services supporting the business park uses were also allowed. Copies of the <br />permitted/conditional uses for this site by the Stanley Business Park PUD development plan and <br />the proposed permitted/conditional uses of the City's C-N, Neighborhood Commercial, District <br />are attached. "Che proposal to modify the Stanley Business Park PUD as to uses is site specific <br />only and does not modify the greater Stanley Business Park in its entirety. This clarification has <br />been added as a condition of approval. <br />The proposed project will introduce a major retail development to this area reflecting a similar <br />development pattern on the west side of Bernal Avenue. Accommodating the proposed retail <br />uses requires the major modification of the Stanley Business Park development plan. Staff <br />worked with the applicant in developing the list of permitted and conditionally permitted uses <br />for this development, which incorporated selected uses from the Stanley Business Park devel- <br />PCUP-165/PDR-529/PMOD-81-25-7M Page 28 of 36 December 13, 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.