My WebLink
|
Help
|
About
|
Sign Out
18 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
051507
>
REGULAR MEETING
>
18 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2007 11:14:37 AM
Creation date
5/11/2007 11:56:43 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
5/15/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
18 Attachments
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
racks are conditioned to be provided for each building to facilitate bicycle parking for this de- <br />velopment. The applicant concurs with this requirement. <br />Off Street Bicycle Lanes <br />At the work session, the Planning Commission directed staff to provide for safe bicycle routes <br />through the project. <br />"I'he proposed project provides a designated bike route on Stanley Boulevard and Bernal Avenue <br />within the road section along with the ability to ride on a ten-foot wide Stanley Boulevard <br />and an eight-foot wide -Bernal Avenue -separated sidewalk. The sidewalks adjoining Stanley <br />Boulevard and Bernal Avenue would be separated from the street curb by a five-foot wide plant- <br />ing strip. These designated bike routes will be in addition to the bike lanes to be provided in <br />these street rights-of-way. <br />Figure 10 is a section through Stanley Boulevard showing the street, separated sidewalk, and <br />building. <br />~• :. <br />• L/~~+•I <br />-,•I' <br />t.. <br /> •, <br />:;: <br />• <br />. <br />' <br />~ <br />' ~ <br />~ ~ <br />~ y~ . . <br />I ~ <br />I <br />~ - <br />- ~ t+.... ~~ r <br /> .~, <br />__ ~. Jtr~~ALE <br /> <br />• Slt y{.IE <br />~z Lo v~NiFs <br />F,1~FL L ~Mt "._S~IIL <br />L:/Ty YMt <br />UvE . <br />..' <br />d _ ~ _ -. -. ____. -... <br />__ <br />'FE 1NUF1 RNEL Ruff 7P!'A 7Pye~'.fL Fir.t1 7FA.[L <br />U{ UVF UVE V1.F L4V[ L4YE LAVE LpV[ <br />Figure 10: Stanley Boulevard Street Section <br />Although the proposed sidewalk width on Bernal Avenue is two-feet less than the ten-foot Fed- <br />eral recommendation for a combined bicycle/pedestrian sidewalk, staff considers the eight-toot <br />width to be acceptable given that a bicycle lane will still be provided in Bernal Avenue and that <br />sidewalks narrower than the Federal recommendation are used in the Hacienda Park -nine feet <br />in width -and on the east side of Valley Avenue -eight feet in width -for Pleasanton's seg- <br />ment of the Iron Horse Trail. <br />The separated sidewalk can be accommodated along all project frontages, maintaining the build- <br />ing/landscape setbacks along these frontages without changing the site plan, except for the area <br />between the main access driveway opposite Utah Street and Nevada Court. To maintain an ade- <br />quate landscape area for a bio- swale between the sidewalk and the parking spaces, staff recom- <br />mends deleting 15 parking spaces from the parking rows perpendicular to Bernal Avenue. This <br />PCUP-165/PDR-529/PMOD-81-25-7M Page 23 of 36 December l3, 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.