Laserfiche WebLink
The parking lot and drive aisles would drain into shallow, landscaped biofilter swales along the <br />perimeter of the parking lot that would filter contaminants from the stormwater before entering . <br />the arroyos and, ultimately, the bay. This is the type of stormwater runoff measure strongly <br />supported by the Regional Water Quality Control Board and local agencies like Pleasanton <br />implementing the urban clean water runoff program. <br />Building Design <br />The subject site is a sensitive one due to its proximity to the adjacent residences and its frontage <br />on a major City thoroughfare. Therefore, staff worked with the applicant to design a building <br />with high quality architecture and materials. Staff believes that the building is attractive and <br />contains design elements, described earlier, which break up its mass and volume. Staff also <br />believes that the building is well articulated and would be compatible with the surrounding <br />buildings. The colors and materials of the building will complement the building architecture <br />and would be compatible with other buildings in the area. Staff also finds the building height to <br />be acceptable and compatible with the surrounding structures. <br />Green Building <br />The City's Green Building Ordinance requires projects containing 20,000 square feet or more of <br />conditioned floor area to meet a LEEDT"' "Certified" level, which is equal to a score of 26 or <br />more credit points on the LEED Green Building Checklist. Since the proposed building is <br />21,295 square feet, it is required to meet a ``Certified" rating. The applicant has proposed to <br />incorporate green building measures into the project to allow the project to qualify for 30 credit <br />points and meet a LEED ``Certified" rating as required by the City's Green Building Ordinance. <br />Some of the proposed green building measures include: using a highly reflective roof surface to <br />reduce a heat island effect; installing high efficiency toilets and urinals to reduce water <br />consumption; exceeding the minimum Building Code energy efficiency standards by 21 percent; <br />using recycled content building materials; and utilizing low volatile organic compound (VOC) <br />emitting materials. <br />Signage <br />A six-foot tall by eight-foot wide monument sign is proposed in the landscaped area on the west <br />side of the building. The sign would consist of astucco-finished sign panel supported by a <br />cultured stone base, matching the colors and materials of the office building. Staff believes that <br />the size, location, and design of the monument sign are acceptable. Since details of the sign text <br />and illumination have not been provided, staff has included a condition of approval requiring <br />applied metal letters with external spot illumination, either by decorative lights mounted on the <br />sign or by ground-mounted lights. <br />Page - 1 S <br />