My WebLink
|
Help
|
About
|
Sign Out
13 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
071707
>
13 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2007 12:55:44 PM
Creation date
7/11/2007 11:56:59 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
7/17/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
13 ATTACHMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUD-65 Environmental Checklist <br />Less Than <br />Potentially Signitcant Less Than <br />Significant With Mitigation Significant No <br />Issues Impact Incorporated Impact Impact <br />Air Quality <br />Where available, the significance criteria established by the applicable air quality management <br />or air pollution control district may be relied upon to make the following determinations. Would <br />the project: <br />a) Conflict with or obstruct implementation of the ~ ~ ~X <br />applicable air quality plan? <br />b) Violate any air quality standard or contribute ~ ~ X <br />substantially to an existing or projected air quality <br />violation? <br />c) Result in a cumulatively considerable net increase ~ ~ ~X <br />of any criteria pollutant for which the project <br />region is non- attainment under an applicable <br />federal or state ambient air quality standard <br />(including releasing emissions which exceed <br />quantitative thresholds for ozone precursors)? <br />d) Expose sensitive receptors to substantial pollutant ~ ~ ~X <br />concentrations? <br />e) Create objectionable odors affecting a substantial ~ ~ ~ ^X <br />number of people? <br />Discussion <br />a-d) The proposed project is expected to generate short-term impacts related to constriction <br />activities (e.g., clearing/grubbing, site grading, etc.). Construction activity on the site is <br />required to implement dust control measures (e.g., periodic watering of the site, cover all <br />trucks hauling soil, sand, and other loose material, etc.) to control airborne particulate. <br />All construction equipment is required to meet all current exhaust standards for <br />em>ss>ons. <br />Long-term operational emissions would be generated by both stationary and mobile <br />sources as a result of normal day-to-day activities on site subsequent to constriction <br />completion. Stationary area source emission would be generated by space (HVAC) and <br />water heating devices and operation of landscape maintenance equipment. Mobile source <br />emissions would be generated by motor vehicles traveling to and from the project site. <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.