Laserfiche WebLink
PUD-65 Environmental Checklist <br />including where wildlands are adjacent to <br />urbanized areas or where residences are <br />intermixed with wildlands? <br />Discussion <br />a,b) During construction potentially hazardous liquid materials such as oil, diesel fuel, <br />gasoline, and hydraulic fluid would be used at the site. If spilled, these substances could <br />pose a risk to the environment and to human health. In the event of a spill, the <br />Livermore-Pleasanton Fire Department is responsible for responding to non-emergency <br />hazardous materials reports. The use, handling, and storage of hazardous materials are <br />highly regulated by both the Federal Occupational Safety and Health Administration <br />(Fed/OSHA) and the California Occupational Safety and Health Administration <br />(Cal/OSHA). The City has in place an Emergency Response Plan to meet the needs <br />should a spills or a hazardous event take place. Routine transport, use and disposal of <br />hazardous materials are already regulated by federal, state and local regulations. This <br />project will require disclosure of any hazardous materials, the amounts anticipated and <br />where those materials will be stored or used. Therefore, this would be a <br />less-than-sia nificant-impact. <br />c) Uses allowed on this site are not associated with substantial use, storage, or transportation <br />of hazardous substances. Therefore, the proposed project would not pose a hazardous <br />emission risk to any existing or proposed schools proximate to this project. Therefore, <br />this would be categorized as no-impact. <br />d) The site is not included on the list of hazardous materials sites compiled pursuant to <br />Government Code 65962.5 (Cortese List). Therefore, this would be categorized as <br />no-impact. <br />e,f) The site is located approximately 4.2 miles from the Livermore Airport and is not likely <br />to result in a safety hazard for future workers or patrons at this site. Therefore, this <br />would be categorized as no-impact. <br />g) The proposed project will not result in interference with an emergency plan or evacuation <br />plan. Therefore, this would be categorized as no-impact. <br />h) Wildlands do not exist within or adjacent to the subject site. Therefore, this would be <br />categorized as no-impact. <br />8. HYDROLOGY AND WATER QUALITY <br />Environmental Setting <br />The National Pollutant Discharge Elimination System (NPDES) was established in the Clean <br />Water Act to regulate municipal and industrial discharges to surface waters of the U.S. Non- <br />point pollution sources originate and diffuse over a wide area rather than from a definable point. <br />19 <br />