My WebLink
|
Help
|
About
|
Sign Out
2004 JANUARY
City of Pleasanton
>
CITY CLERK
>
MUNICIPAL CODE SUPPLEMENTS
>
2004 JANUARY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2009 1:57:15 PM
Creation date
7/13/2007 2:18:05 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
CODE SUPPLEMENTS
DOCUMENT DATE
1/1/2004
DOCUMENT NO
2004 JANUARY
DOCUMENT NAME
SUPPLEMENTAL NO 14
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18.124.290 <br />G. The fuel source for electricity <br />generator facilities shall be natural gas, <br />bio diesel, or the byproduct of an ap- <br />proved cogeneration or combined cycle <br />facility. <br />H. On a site with electricity genera- <br />tor facilities, medium fuel cell facilities <br />shall not be permitted unless the aggre- <br />gate wattage of the two (2) facilities is <br />either: 1) ten (10) megawatts or less, or <br />2) if the aggregate wattage is greater <br />than ten (10) megawatts, no electricity <br />is exported off site. If the aggregate <br />wattage is greater than ten (10) <br />megawatts in size, and some electricity <br />is exported off site, the fuel cell facili- <br />ties shall be subject to all requirements <br />and processes prescribed in this title for <br />large fuel cell facilities in the applica- <br />ble zoning district. <br />I. On a site with fuel cell facilities, <br />medium electricity generator facilities <br />shall not be permitted unless the aggre- <br />gate wattage of the two (2) facilities is <br />either: 1) ten (10) megawatts or less, or <br />2) if the aggregate wattage is greater <br />than ten (10) megawatts, no electricity <br />is exported off site. If the aggregate <br />wattage is greater than ten (10) <br />megawatts in size, and some electricity <br />is exported off site, the electricity gen- <br />erator facilities shall be subject to all <br />requirements and processes prescribed <br />in this title for large fuel cell facilities <br />in the applicable zoning district. <br />7. If the facilities are large electricity <br />generator facilities, the facilities shall <br />be designed such that there is no waste- <br />water discharged into the sewer system. <br />K. If the facilities are large electrici- <br />ty generator facilities or large fuel cell <br />facilities, the facilities shall be located <br />at least one mile away from the prop- <br />erty lines of the following: <br />1. Existing or approved residences in <br />Pleasanton; and <br />2. Undeveloped residential zoning <br />districts and undeveloped planned unit <br />developments in Pleasanton with a <br />residential zoning designation and <br />without an approved development plan. <br />(Ord. 1880, 2003) <br />632-1 (Pleasanton January 2004) <br />
The URL can be used to link to this page
Your browser does not support the video tag.