Laserfiche WebLink
~..~ <br />shall not exceed the normal angle of <br />repose of the excavated materials, and <br />shall not exceed one foot (1') horizon- <br />tal to one foot (1') vertical. <br />C. Temporary cut slopes steeper than <br />one foot (1') horizontal to one foot (1' ) <br />vertical shall be no closer to a property <br />line than twenty five feet (25') plus the <br />vertical depth of the cut, shall be no <br />closer to a public street right of way <br />than fifty feet (50') plus the vertical <br />depth of the cut, and shall be no closer <br />to a stream or channel than one hun- <br />dred feet (100') plus the vertical depth <br />of the cut. <br />D. The excavation of a pit or quarry <br />shall be conducted in such a manner as <br />to prevent accumulation of polluted <br />water or natural seepage to the maxi- <br />mum extent possible, but not preclud- <br />ing the use of pits for recharge purpos- <br />es. <br />E. Dikes and other barriers and <br />drainage structures shall be provided <br />where necessary to prevent silting of <br />drainage channels or storm drains in the <br />area surrounding the excavation. <br />F. Where required by the Commis- <br />sion, final cut slopes shall be treated to <br />prevent erosion, topsoil shall be re- <br />placed on such slopes to support vege- <br />tation and suitable groundcover shall be <br />planted and maintained for a period <br />sufficient to provide vegetation of a <br />density and groundholding capacity that <br />will prevent erosion. <br />G. Material used for refilling a pit or <br />quarry, including overburden removed <br />from elsewhere on the site, shall be of <br />a quality determined suitable to prevent <br />contamination of the groundwater either <br />18.52.100 <br />during operations or upon completion <br />or termination of operations. <br />H. Quarry or pit excavations that <br />penetrate near or into awater-bearing <br />stratum shall be conducted in such a <br />manner that such stratum will not be <br />subject to pollution or contamination <br />either during operations or subsequent <br />to termination. The Commission may <br />prescribe the maximum depth of a pit <br />or quarry in relation to the depth of any <br />aquifer described and defined in publi- <br />cations of the State Department of <br />Water Resources. <br />I. Fencing shall be provided and <br />maintained surrounding all areas being <br />excavated to prevent unauthorized <br />access in accord with the requirements <br />and specifications of the Public Works <br />Department. Such fencing shall be lo- <br />cated no closer than ten feet (10') from <br />the top edge of a proposed cut slope. <br />J. All reasonable control measures <br />shall be employed to reduce dust in the <br />processing and transportation opera- <br />tions. Haulage roads shall be paved, <br />oiled or watered, and shall be main- <br />tained in a dust-free condition. Access <br />roads shall have pavement at least <br />twenty four feet (24') wide and shall <br />extend from the public street to the <br />permanent public scale but not less than <br />five hundred feet (500' ). <br />K. Vehicles hauling excavated mate- <br />rial shall be loaded in such a manner as <br />to prevent spilling the material while in <br />transit. The Commission may designate <br />which public streets may be used in <br />hauling excavated material, and may <br />prohibit the use of any other street. <br />L. No explosives shall be used <br />543 (Pleasanton 5-99) <br />