Laserfiche WebLink
20.52.030 <br />ing or containing sufficient quantities <br />of toxic or explosive substances to be <br />dangerous to the safety of the general <br />public if released. <br />C. "High-risk building" is any build- <br />ing, other than an essential or hazazd- <br />ous building, having an occupant load <br />of one hundred (100) occupants or <br />more as determined by section 1003.2.2 <br />of the Uniform Building Code, except <br />that ahigh-risk building shall not in- <br />clude the following: <br />1. Any building having exterior walls <br />braced with masonry cross walls or <br />wood frame cross walls spaced less <br />than forty feet (40') apart in each story. <br />Cross walls shall be full story height <br />with a minimum length of one and one- <br />half (1'/2) times the story height. <br />2. Any building used for its intended <br />purpose, as determined by the Director, <br />for less than twenty (20) hours per <br />week. <br />D. "Minimum-risk building" is any <br />building, not classified as a high-risk <br />building or an essential or hazazdous <br />building, having an occupant load of <br />twenty (20) occupants or more as deter- <br />mined by section 1003.2.2 of the Uni- <br />form Building Code. <br />E. "Low-risk building" is any build- <br />ing, other than an essential or hazazd- <br />ous building, having an occupant load <br />of less than twenty (20) occupants as <br />determined by section 1003.2.2 of the <br />Uniform Building Code. (Ord. 1778 <br />§ 11, 1999; Ord. 1669 § 11, 1995; Ord. <br />1563 § 1, 1992) <br />20.52.040 Owner Notification: <br />The Director of Building Inspection <br />shall, within six (6) weeks of the effec- <br />1. See following page for Tables A and B. <br />tive date hereof, notify the owners of <br />property improved with unreinforced <br />masonry buildings determined to be <br />within the scope of this Chapter that <br />such owners are required to submit <br />engineering reports, building analysis, <br />plans for the repairs and complete any <br />necessary structural repairs within the <br />time limits established by Section <br />20.52.050 of this Chapter. (Ord. 1563 <br />§ 1, 1992) <br />20.52.050 Mitigation Plan: <br />A. Step 1: <br />The property owner shall submit to <br />the City within one yeaz of the adop- <br />tion of this Chapter a structural engi- <br />neering report. The purpose of this <br />report is to establish, by required tests, <br />the strength of the mortaz material <br />holding the bricks or hollow clay <br />blocks together. Such tests will reveal <br />if the walls have proper attachment to <br />the roof system and, in the case of <br />multi-story buildings, that the floor <br />systems are also properly attached to <br />the wall system. The tests are to be <br />completed by a licensed engineer or <br />azchitect. A property owner with a <br />building which does not have a proper <br />wall-to-roof or wall-to-floor attachment <br />must complete the attachment within <br />two (2) yeazs of the adoption of this <br />Chapter. <br />B. Step 2: <br />1. If the property owner desires to <br />reinforce the existing building, the <br />property owner is to submit plans to the <br />City's Building and Planning Depazt- <br />ments. The property owner shall com- <br />plete the repairs based on the classifica- <br />tions (Table A)' within the time <br />(Pleasanton April 2000) ']34_2 <br />