My WebLink
|
Help
|
About
|
Sign Out
17 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
090407
>
17 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2007 5:17:02 PM
Creation date
8/30/2007 5:16:56 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
9/4/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
17 ATTACHMENTS
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
325
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wetlands and Waters <br />A total of nine drainages flow from south to north across the project site with varying <br />degrees of branching. The majority of the drainages within the project site are ephem- <br />eral. Portions of some drainages are intermittent in nature. Ephemeral drainages do <br />not show evidence of carrying water for more than a few days following rain. <br />Intermittent drainages show evidence of carrying water for a week or more following <br />rain. The two stock ponds on the site are constructed features in the paths of drainages <br />to provide water for livestock. <br />Two wetland plant communities -freshwater seep and seasonal wetland area -are <br />also found in small portions of the project site. Six seasonal freshwater seeps are <br />located along the northern slopes of the site's hillsides. The seasonal wetlands tend to <br />occur in depressions that are inundated during the rainy season for a long enough <br />period of time to support vegetation adapted to wetland conditions. These areas are <br />shown on the biological maps in the DEIR. As identified in the EIR, the proposed <br />development could significantly impact the site's wetland areas unless mitigation <br />measures are implemented. <br />Development including fill will impact a total of 145 linear feet of ephemeral streams. In <br />addition, 0.046 acre of seasonal wetlands and freshwater swales would be affected, <br />including 0.033 acre of isolated wetlands. The majority of these areas are located in the <br />portion of the project farthest to the south and southwest along the most southerly <br />section of Street "A" and along the extension of Court 5 toward the west. <br />The areas are subject to Army Corps review with its Section 404 permit. As <br />conditioned, the Corps shall be consulted by the applicant and/or the City before the <br />approval of the first final subdivision map or before issuance of a grading permit. Once <br />the Corps has completed its review, additional mitigation may be required beyond any <br />City-imposed measures. Impacts on waters of the U.S. and isolated wetlands also must <br />be approved by the Regional Water Quality Control Board through its Section 401 water <br />quality permit. In addition, any impacts on waters on the site will require a Section 1602 <br />Streambed Alteration permit from California Department of Fish and Game. Neither of <br />the two stock ponds contains aquatic vegetation and neither one is considered <br />jurisdictional waters. <br />Blue Oak Woodland and Heritage Trees: <br />To mitigate the loss of blue oak woodland trees and heritage trees from site preparation <br />and development, the applicant is required to plant 400 trees in the open space areas of <br />the project. This number was based on the 98-unit development plan and has been <br />carried over to the 51-unit development plan now proposed. The 400 trees to be <br />planted by the applicant would be augmented by the trees that will be planted with the <br />individual lot developments, estimated at approximately 600 additional trees. <br />Of the 400 trees proposed to be planted in the open space areas, 220 trees would be <br />replacement trees for the blue oak woodland trees and 180 trees would be replacement <br />trees for other species. The replacement trees would be required to be planted in the <br />development's open space areas with the first phase of subdivision construction, and <br />PUD-33 Page 33 of 59 June 13, 2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.