Laserfiche WebLink
The project will be required through the grading and building permit and construction <br />processes to incorporate best management practices to control erosion and to prevent <br />discharges into the City's storm drain system resulting from this development. <br />Building Design Guidelines <br />Guidelines <br />The building and landscape design guidelines provide detailed and comprehensive <br />landscape and building design standards -diagrams, photographs, and drawings - <br />addressing materials, massing, detailing, architectural types, planting, etc., for clear <br />guidance to future owners regarding all aspects of the designs of these homes. Staff <br />believes that the proposed guidelines would provide a comprehensive level of detail and <br />direction to the future homeowners regarding all aspects of the designs of their homes. <br />While comprehensive in scope, staff has recommended changes to the design <br />guidelines -floor area ratio, accessory structure building height, second units, etc. - <br />which are detailed in the draft conditions of approval. The discussion of several of <br />these changes follows. <br />Review Procedures <br />The guidelines also state the design review procedures for these homes. The first <br />review stage is peer review of the design proposal provided by the Oak Grove <br />Architectural Review Committee. After the committee has reviewed and approved the <br />design plans, the homeowner would then submit the formal design application to the <br />Planning Department for review by the Zoning Administrator. <br />The neighborhoods immediately adjoining the north and west sides of the Oak Grove <br />development would receive notice of the proposed design application. To inform the <br />Planning Commission of the Zoning Administrator's actions, staff would use the <br />procedures being followed with the Mariposa Ranch homes by the Callippe Golf <br />Course. With the notification of the Zoning Administrator's action sent to the Planning <br />Commission, staff will provide the approval letter, conditions of approval, and the plan <br />set including colored building perspectives and building elevations. Also provided is an <br />expanded 20-day appeal period. <br />Development Standards <br />Uses <br />The 51 lots of this development will be subject to the permitted and conditional uses of <br />the R-1 (One Family Residential) District as described under Chapter 18.32 of the <br />Pleasanton Municipal Code. <br />BuildincLSetbacks <br />The building setbacks for these lots are illustrated in the design guidelines on a diagram <br />of each lot. They were prepared by the applicant with staff input, and are based on the <br />lot's location, topography, visibility, and the presence of existing trees. Unlike the <br />building setback standards of most PUD-based residential developments that reference <br />a standard City zoning district, the building setbacks for Oak Grove are specific to this <br />PUD-33 Page 49 of 59 June 13, 2007 <br />