My WebLink
|
Help
|
About
|
Sign Out
RES 88286
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1988
>
RES 88286
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2012 12:29:21 PM
Creation date
12/3/1999 12:01:03 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/21/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and that this Project would contribute to the long term <br />cumulative demand for library facilities. The DEIR indicates <br />on page 73 that no mitigation measures are required.~- <br /> <br /> 2. Paa3daa3z~. <br /> <br /> a. Based upon the above facts, and upon <br /> <br />the DEIR's conclusion that no mitigation measures are required, <br />this City Council finds that the Project and subsequent <br />development of the Project site will have no significant <br />adverse impact upon library facilities. <br /> <br /> Q. Public Services And Utilities-Schools. <br /> <br /> 1. Facts. <br /> <br /> The DEIR indicates at pages 73-74 that approval of the <br />Project would allow development which will increase enrollments <br />in Pleasanton's schools, contributing to the longterm need for <br />construction of additional schools. The DEIR notes that <br />Pleasanton schools are currently at capacity, and that the City <br />is currently implementing Assembly Bill 2926, which authorizes <br />school districts to impose school impact fees of $1.50 per <br />square foot of habitable residential space. <br /> <br /> Apart from the imposition of any fees pursuant to <br /> <br />AB 2926, the DEIR notes that no mitigation measures are <br />included in the proposed Project, and recommends as an <br />additional mitigation measure that the school district's long <br />range forecasts be amended to reflect the increase in the <br />general plan holding capacity if a project alternative <br />requiring amendment of the general plan is approved. <br /> <br /> 32 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.