My WebLink
|
Help
|
About
|
Sign Out
RES 87418
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1987
>
RES 87418
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2017 4:23:58 PM
Creation date
12/6/1999 11:19:45 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
9/15/1987
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
for the benefit of the Owners of the Certificates. Any suit <br />for money damages would be subject to limitations on legal <br />remedies against cities in California, including a limitation <br />on enforcement of judgments against funds needed to serve the <br />public welfare and interest. See "APPENDIX B - S~MARIES OF <br />DOCUMENTS -- THE FACILITY LEASE -- DEFAULT BY CITY." <br /> <br />Abatement <br /> <br /> In the event the construction of Capital Project I is not <br />completed or in the event of loss or substantial interference <br />in the use and possession of all or any portion of the Project <br />by the City caused by material damage or destruction to or <br />condemnation of the Project, Rental Payments will be subject to <br />abatement. In the event the Project could not be replaced <br />during the period of time that proceeds of the City's rental <br />interruption insurance will be available (with respect to <br />Capital Project II) in lieu of Rental Payments plus the period <br />for which funds are available from the Reserve Fund, or in the <br />event that casualty insurance proceeds (with respect to Capital <br />Project II) or condemnation proceeds are insufficient to <br />provide for complete repair or replacement of the Project or <br />redemption of the Certificates, there could be insufficient <br />funds to cover payments to Certificate Owners in full. <br /> <br />No Acceleration Upon Default <br /> <br /> If the City defaults on its obligations to make Rental <br />Payments, the Trustee may have limited ability to re-let the <br />Project so as to preserve the tax exempt nature of the interest <br />component of the Rental Payments and the Certificates. In the <br />event of a default, there is no available remedy of <br />acceleration of the total Rental Payments due over the term of <br />the Lease. The City will only be liable for Rental Payments on <br />an annual basis, and the Trustee would be required to seek a <br />separate judgment each year for that year's Base Rental <br />Payments. <br /> <br />Insolvency or Bankruptcy of the Lessor <br /> <br /> Title to the Project will be held by the Lessor throughout <br />the term of the Lease. Therefore, the title to the Project may <br />be considered property of the estate of the Lessor which may be <br />disposed of by a bankruptcy court in the event of a bankruptcy, <br />insolvency or similar proceeding by or against the Lessor. <br /> <br /> 32 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.