Laserfiche WebLink
. _ MAP.-.E1-1996 09~ 25 <br />FROM ~leuard Development Inc TO ~ 4e4E236 P.04 <br />PRELIMINARY EHGlNEER~ COST ESTIMATE <br />WATER RESERVOIR AND DUMP STATION FOR MOLLER RANCH <br />iTEM OESCR1PT10N <br />A. Water Tank Improvements <br />1 Rough grading (access roan) <br />2 Fine grading (access road) <br />3 2.5' A.C. over 8' A.B. (access road) <br />4 Drainage (access road) <br />5 Water tank <br />6 Pressure reducing station <br />7 NoRh Muirwood water extension <br />8 Landxaping <br />9 12' waterline along lot Iii i <br />10 12" waterline from Molter Ranch Or, to tank <br />UNITS d[t0~ UNIT T PRICE <br />GY <br />SF <br />SF <br />LS <br />LS <br />LS <br />lS <br />LS <br />LF <br />lF <br />Oosign fees (civil b construction staking) <br />Bolls £nptneers fees <br />Cn®cktng b inspection fees <br />Geologic analysis of water tank site LS <br />10% overhead <br />Subtotal of Construction Costs of Water Tank <br />8. Pump Station <br />1 1/3 total pump station cost to be appliPCi in LS <br />Molter R3ncR (total ostimated cost of pump <br />station ~ 5742,200) <br />SUbtotOt Of Construction Costs of -Pump Station <br />TOTAL CONSTRUCTION COST <br />~1,184,Z8b <br />~icNa~~r A <br />6/t 3/S5 <br />J08 >ti N10t758.20 <br />WATRTAriK.XLS <br />Pafle 1 of 1 <br />gMOUNT <br />,s,ooo Sz.oo sso.aoo <br />25,300 50.15 53.785 <br />22.500 SZ.00 545.800 <br />~ s2o,soo.oo ~ s20.soo <br />1 5387.400.00 5387.400 <br />1 535,000.00 535.000 <br />~ 524,500.00 SI4,500 <br />1 5100.000.00 5100,000 <br />520 540.00 520.800 <br />~ .1 SA 540.00 546.320 <br />Subtotal 5734,115 <br />8016 $58.729 <br />t °/b 57,341 <br />6910 544,047 <br />1 s7.soa s7.soo <br />Iota! fees 51 t 7,617 <br />Subtotal Si51,73Z <br />sas.l7s <br />5936.905 <br />1 5247.380.00 5247.380 <br />Subtotal SZ47.380 <br />