My WebLink
|
Help
|
About
|
Sign Out
KAUFMAN AND BROAD - REIMBURSEMENT AGMT INTERIM STREET IMPROVEMENTS TO STANLEY BLVD.
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
K
>
KAUFMAN AND BROAD - REIMBURSEMENT AGMT INTERIM STREET IMPROVEMENTS TO STANLEY BLVD.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2007 11:55:41 AM
Creation date
10/3/2007 2:47:13 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
5/18/1993
LONG TERM AGREEMENTS - NAME
KAUFMAN AND BROAD
LONG TERM AGREEMENTS - TYPE
REIMBURSEMENT AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bissell • <br />~~ Karr- <br />a <br />Job #N 1 298.10 <br />March 24, 1993 <br />Page 1 <br />EXHIBIT "A" <br />ENGINEER'S PRELIMINARY COST ESTIMATE <br />INTERIM OFF-SITE IMPROVEMENTS <br />(TO BE RETAINED WITH ULTIMATE IMPROVEMENTS) <br />(SOUTH OF THE PROPOSED STREET CENTERLINE ALONG ROSA, KAPLAN, WHITE, <br />PUBLIC STORAGE AND AUFDERMAUR) <br />TRACT 6545 <br />PLEASANTON, CALIFORNIA <br />SUMMARY <br />A. Grading S 6,000.00 <br />B. Paving 52,551.00 <br />C. Concrete 2,856.00 <br />D. Storm Drain 15,496.00 <br />E. Miscellaneous 2.000.00 <br /> <br /> Subtotal S 78,903.00 <br /> Construction Contingencies 10% S 7,890.00 <br /> <br /> Total Construction Costs S 86,793.00 <br />Notes: <br />1. All cost figures given are estimates only. Actual cost will be dependent on the cost <br />figures at bidding time; the general market situation, contractor's workload, <br />seasonal factor, labor and material cost, etc. This engineering firm cannot be <br />responsible for fluctuations in cost factors. <br />2. This cost estimate is based on the Off-Site Improvement Plans for Tract 6545 <br />prepared by Bissell & Karn dated March 19, 1993. <br />3. Landscape, City Fees and Engineering Costs are not included in this cost estimate. <br />4. Parking Lot Improvements for Kaplan Property are not included in this cost estimate. <br /> <br />CBE.21 .25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.