My WebLink
|
Help
|
About
|
Sign Out
AHMANSON DEVELOPMENTS REIMBURSEMENT OFFSITE SIGNAL IMPROVEMENTS
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
A
>
AHMANSON DEVELOPMENTS REIMBURSEMENT OFFSITE SIGNAL IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2007 11:34:42 AM
Creation date
10/3/2007 2:52:15 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
9/1/1991
LONG TERM AGREEMENTS - NAME
AHMANSON DEVELOPMENTS
LONG TERM AGREEMENTS - TYPE
REIMBURSEMENT AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I ~ <br />c ~ n c a a ^ EXHIBIT "A" <br />e c c c <br />c c o a a <br /> ROBERT GRAY 6 ASSOCIATES <br />p p p p D ^ 0 O D O D ~ D O ^ O <br />uTi~1TY LONSTRUCTION CONSULTANTS <br /> 5c:5 WEST SAS oOSITA$ BLV'J.. SUITE d0+ <br /> %~EASANTON GAi1FOPNIA 9d586 <br />^ m o o ^ ^ ^ e v m m o v v o v <br /> ~,5 d6~ ofi'3 <br />January 11, 1991 - <br />The DeSilva Grou ,Inc. ~ ~ ~ ~~ <br />P <br />7041 Koll Center Parkway ~~~ <br />suite 290 FEB - d 1991 ~' <br />Pleasanton, CA 94566 ~~ <br />Attention: Jim Summers <br />Re: Laguna Oaks <br />Foothill Road <br />RGA Job # 8981 T-2 <br />Dear Jim: <br />The following is a break down of the traffic signal interconnect <br />cost along Foothill Road. <br />Description Quantity IInit Price Extension <br />E.9 <br />#6 Splice Box 12 ~ $ 166.00 EA $ 1,992.00 <br />3" Conduit with <br />Pull Rope 4,350 LF $ 1.97 LF $ 8,569.50 <br />Joint Trench Portion 10,025.81 Lot --- $10,025.81 <br />TOTAL ..................................................520.587.3 <br />Enclosed is a copy of .our Form "B" which stipulates the trench <br />occupancy percentages. The above cost consists of 195 LF of "G-2" <br />trench, and all of trenches "D" through 1tD-19". <br />Sincerely, <br />Robert L. Gray <br />RLG/lg <br />
The URL can be used to link to this page
Your browser does not support the video tag.