Laserfiche WebLink
k <br />• <br />Bidder acknowledges receipt of the following addendum: <br />No. <br />- / <br />2 <br />Date ;tiro. <br />`f' <br />I ~- <br />• <br />Date <br />Bidder to perform all of the work described in the Contract Documents for the total bid <br />amount entered. <br />BID SCHEDULE <br />Lump Sum Price for Construction of Livermore-Pleasanton Fire Department, <br />Pleasanton Fire Station No. 4 <br />Project No. 018046 <br />Pleasanton, California <br />~~ ry~ ~. J <br />1. Construction of a new LEED silver level certification fire station including all site <br />preparation, all exterior and interior work, and all related on and off site <br />improvements, complete, all in accordance with the requirements of the Contract <br />Documents. <br />TOTAL BID PRICE <br />For the lump sum of <br />~ 3~ 230, o as <br />,'--~ <br />(Price in figure) <br />~ t ~R~~ nn«~r~~ ~ tc?o ~(~~"~,~~..~ ~~ bit ~N~sx1~~ <br />(Price in words) ~ L L~Q ~' <br />The contract will be awarded to the lowest responsive, responsible bidder based upon the <br />Total Base Bid. <br />Attached is a bid guaranty bond duly completed by a guaranty company authorized to <br />carry on business in the State of California in the amount of at least ten percent (10%) of <br />the total amount of the bid, or alternately, there is attached a certified or cashier's check <br />payable to the City in the amount of at least ten percent (10%) of the total amount of the <br />bid. <br />If this Bid Proposal is accepted, bidder agrees to sign the contract and to furnish the <br />performance bond, labor and materials bond, maintenance bond, and the required <br />M:~2002 Projects Architecture\2002003 LPFD Station #4~.Specifications~specifica6on boilerplate.doc Page; 6 <br />