Laserfiche WebLink
M N <br />sewer line shall occur no later than commencement of the develop- <br />ment of the Remainder Property and shall have a minimum of two <br />feet of cover. <br />4. Storm Drainage Improvements. City is contemplating n- <br />stalling all or portions of a permanent storm drainage system to <br />serve the Chu property, eastern Mohr-Martin-Trenery area, the <br />Busch property, and lands to the south of Busch Road at the time <br />of developing the Property. City and Owner agree to cooperate to <br />install temporary storm drainage improvements across the lands of <br />Owner, if necessary. Should City require an easement for storm <br />drainage purposes, City and Owner agree to negotiate a mutually <br />acceptable method, location, and consideration for same. Any <br />permanent storm drainage improvements designed and/or installed <br />by City to serve the Property shall be designed to accommodate <br />the Remainder Parcel. City shall install, or have installed, a <br />storm drainage system capable of serving the Remainder Property <br />no later than commencement of the development of the Remainder <br />Property. Owner agrees to cooperate in the financing of said <br />permanent storm drainage system at the time the city constructs, <br />or has constructed, these improvements. <br />5. Consideration. City shall pay Owner the sum of ONE MIL- <br />LI©N, .SIX HUNDRED EIGHTY-SEVEN THOUSAND, NINE HUNDRED DOLLARS <br />($1,687,900.00).. In the event conveyance takes place after <br />May 1, 1986, as provided in Section 7, the consideration shall <br />increase by $9,600 per month, to be pro rated, in recognition of <br />the increased valuation of the property. The compensation <br />described in this section shall constitute the full compensation <br />- 3 - <br />