My WebLink
|
Help
|
About
|
Sign Out
CAROLINE JOHN (2)
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
C
>
CAROLINE JOHN (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2008 11:46:03 AM
Creation date
10/17/2007 2:02:21 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
11/17/1980
LONG TERM AGREEMENTS - NAME
CAROLINE
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br />2.2 Contribution to Capital Fund. Caroline shall pay <br />to the City on April 15, 1931 or upon the. date the "additional <br />sewer capacity" described in paragraph 2.3 hereof is constructed <br />and is available for use (whichever occurs later), cash in the <br />amount of One Hundred Thousand Dollars (.$100,000.00) as a <br />contribution to the capital fund of the City. <br />2.3 Surcharge for Industrial Capacity and Sewer <br />Connection Fees. Caroline agrees to pay a surcharge pursuant <br />to the formula contained in Exhibit "B" to this agreement, in <br />addition to all regular sewer connection fees payable at the <br />time of connecting any structure or building to the sewer .system, <br />for the portion, if any, of said"additional sewer::. capacity" <br />actually used by Caroline (. or his successor) on Tract 4326. <br />The surcharge may be paid in advance to reduce carrying <br />charges, at Caroline's option. <br />2.4 Other Capacity. Caroline may apply for and purchase <br />sewer connections for Tract 4326 in accordance with the city's <br />standard requirements and procedures utilizing whatever current <br />sewer capacity exists until such time as the sewer capacity <br />to be created pursuant to the Willow West Agreement (.500,000 GPD) <br />becomes available for use by Caroline. Upon notification of <br />the availability of that capacity, Caroline agrees not. to apply <br />for or purchase any other sewer capacity beyond the allocation <br />provided in this agreement until such allocation is exhausted. <br />The limitations on the use of the 500,000 GPD capacity created <br />by the Willow West Agreement shall not apply to any. regular <br />capacity purchased prior to the availability of the said <br />500,000 GPD. <br />_4_ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.