My WebLink
|
Help
|
About
|
Sign Out
CROCKER PROPERTIES
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
C
>
CROCKER PROPERTIES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2008 4:45:52 PM
Creation date
10/18/2007 2:10:45 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
8/20/1990
LONG TERM AGREEMENTS - NAME
CROCKER PROPERTIES
LONG TERM AGREEMENTS - TYPE
REIMBURSEMENT AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />c. Failure to Collect. City shall immediately pay to Developer <br />the Reimbursement Fee for a Contributing Project if, for any reason, City grants an <br />approval to a Contributing Project but voluntarily elects not to collect and pay to <br />Developer the Reimbursement Fee attributable to the Contributing Project. <br />d. City's use of Reimbursement Fees. To the extent that <br />Reimbursement Fees are owed to Developer (or to any other Contributing Project <br />which may have advanced more than its applicable percentage share of Traffic <br />Mitigation Improvements Costs), then the City shall be obligated to pay such <br />Reimbursement Fees owed, subject to the following: <br />(i) Payments collected from each Contributing Project shall <br />first be applied in payment of Actual Traffic Mitigation Improvements Costs then <br />payable in order to maintain LOS "D" at the required intersections as stated above; and <br />(ii) Any remaining funds collected shall be applied in <br />payment of Reimbursement Fees, with such payments to be allocated among <br />Developer and other Contributing Projects owed Reimbursement Fees in proportion to <br />the amount of such Reimbursement Fees owed to Developer and each such <br />Contributing Project. <br />e. This section sets forth several examples of the manner in <br />which Reimbursement Fees would accrue and, ultimately, be paid hereunder. The <br />~~ ~~ <br />addition of a department store at the Stoneridge Mall (Stoneridge) such as Sears <br />shall trigger the need to widen Canyon Way in the form of the Traffic Mitigation <br />Improvement listed as Item A-1 on Exhibit B. Assuming that the Actual Traffic <br />Mitigation Improvement Costs therefor are $500,000, then Stoneridge would be <br />required to pay to the City $374,750 (i.e., the Actual Traffic Mitigation Improvement <br />Costs less the Existing Funding Sources totalling $125,250). Said payment would <br />generate a Reimbursement Fee to Stoneridge in the amount of $225,284 calculated as <br />follows: <br />(i) 178,000 sq. ft. (Sears store) divided by 558,000 sq. ft. <br />(total project) yields an allocable share (of that Contributing Project's total share) of <br />approximately 32%; <br />(ii) 32% of that Contributing Project's Estimated Required <br />Payment is approximately $154,300 (0.32 x $482,149); and <br />(iii) the difference between $374,750 and $154,300 is <br />$220,450 which constitutes the amount paid in excess of such allocable share. <br />Assume that (1) Developer, as the next Contributing Project, is required to fund an <br />additional Traffic Mitigation Improvement, the actual cost of which is $325,000, and (2) <br />Developer's total Estimated Required Payment is $250,000. If Developer obtained a <br />(AGREEMENTS~SRIDGI CL.SAM) $ <br />
The URL can be used to link to this page
Your browser does not support the video tag.