Laserfiche WebLink
EXHIBIT "A" <br />®` BISSELL ~. <br />I~AR N. I N C <br />Two Annabel Lane, Suite 210 <br />San Ramon, CA 94583 <br />(415) 275.1280 Fax (415) 275-1185 <br />October 4, 1990 Job No. 2.00 <br />Carlos Villagran <br />Engineering Department/City of Pleasanton <br />200 Old Bernal Avenue <br />Pleasanton, California 94566 <br />Subject: Golden Eagle Farms Water Tank/Construction Cost Estimate <br />Dear Carlos: <br />I have completed my construction cost estimate for the Golden Eagle Farms <br />Water tank. My estimate is based on estimates given to me by Harry McHugh <br />of Currin Construction Corporation and Ted Fellion of Edward J. Pestana <br />Construction, Incorporated. I believe that these estimates from those <br />actually involved in financing and building the tank will be at least as <br />accurate as any estimate I could make. <br />ITEM <br />Grading <br />Tank & Foundation <br />External Piping, Valve <br />Vault, Paving, Fencing, <br />Drainage, etc. <br />Telemetry <br />SOURCE OF ESTIMATE <br />Harry McHugh <br />Ted Fellion <br />Ted Fellion <br />APPROXIMATE COST <br />$15,000 <br />5190,000 <br />$50,000 <br />SUBTOTAL <br />CONTINGENCY (10%) <br />Harry McHugh <br />TOTAL ESTIMATED CONSTRUCTION COST <br />564,000 <br />5319,000 <br />532,000 <br />5351,000 <br />Note: All cost figures given are estimates only. Actual cost <br />will be dependent on the cost factors at bidding time: <br />the general market situation, contrac~or's workload. <br />seasonal factors. labor and material cost, etc. Bissell <br />& Karn canno` Hein rocnnnc;tilc -~~ ~~iy+„ +•„ <br />cost factors. <br />