My WebLink
|
Help
|
About
|
Sign Out
GREY EAGLE ESTATES - WATER FACILITY & REIMBURSEMENT AGMT
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
G
>
GREY EAGLE ESTATES - WATER FACILITY & REIMBURSEMENT AGMT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2007 10:47:04 AM
Creation date
10/24/2007 8:14:52 AM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
9/11/1984
LONG TERM AGREEMENTS - NAME
GREY EAGLE ESTATES
LONG TERM AGREEMENTS - TYPE
REIMBURSEMENT AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WHEREAS, it is the intention of the parties that the subdivider <br />will provide a combination of real. property, water system improve- <br />ments, and cash equal in value to $112,000($4,000 per connection x 28 <br />connections); and _- "- <br />WHEREAS, it is understood and agreed between the parties that <br />if the cost of needed water facilities were spread evenly between <br />all anticipated near-term developt+lents, the average cost per connec- <br />tion would be $1,050. (Near-term developments are those described <br />in Creegan and D'Angelo letter of July 12, 1984 to R. L. Warnick plus <br />84 units proposed for the "Lund Ranch" in the Bon de Pressure Zone.) <br />WHEREAS, Condition No. 34 of the tentative map approval, <br />Planning Commission Resolution No. 2477, requires that the developer <br />pay a proportionate share of necessary water facilities as a condition <br />precedent to approval of a final map for the subdivision. <br />?'1OW, THEREFO~ZE, in consideration of the faithful performance <br />of the promises, terms, conditions and covenants set forth herein <br />by Subdivider and the approval of the map for recording by the City, <br />the parties hereto agree as follows: <br />1. Work. As a part of the public improvements for Tract :do. <br />5189, Grey Eagle Estates, Subdivider will construct: <br />A. Approximately 1,000 feet of 12-inch water line from <br />Feather Court cul-de-sac to Grey Eagle Court cul-de-sac <br />via the emergency access road; <br />B. 400 linear feet of 12-inch water line from Grey Eagle <br />Court cul-de-sac to the proposed new reservoir; <br />" C. Preliminary grading for the proposed reservoir. <br />The Subdivider and City agree that the approximate value of <br />this work is $S~O,OOO:;i~ <br />2. Reservoir Site. Subdivider will deed to the City an <br />adequate site for the proposed 1.8 million gallon reservoir at a <br />location satisfactory to the City Engineer on proposed Lot 10 <br />and/or 11. Within 30 days after notification from the City Engineer <br />of the approved site, the Subdivider will convey a Grant Deed to the <br />site, along with suitable access easements to the City. The City <br />and Subdivider agree that the value of this dedication is approximately <br />$50,000./ <br />3. Cash Contribution. Within 30 days from the time the City <br />awards a construction contract for a water reservoir of approximately <br />1.8 million gallons capacity within site designated in Section 2 <br />above, the Subdivider will pay to the City $12,000: This amount is <br />calculated by determining the total contribution as $4,000 per <br />connection times 28 connections less the $100,000 contributions of <br />work and land. <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.