Laserfiche WebLink
08/08/02 10:50 FAX 925 L84 8234 <br />CITY - PLEASANTON 01012/022 <br />Example 12B. City installs Part 5 water improvements after all Part 1 <br />development occurs; these improvements cost 520.000 more than the initial <br />estimate. The actual cost of these water improvements are used in determining <br />the fees for development in all areas except Part 1, which has paid fees based on <br />the initial estimate. <br />Example 12C, Lot 9 develops in June 2000. paying its total fee. In September. <br />developer of Lot 23 installs a portion of Part 2 infrastructure at 25% more cost <br />than the initial estimate. Lot 9 developer or (future homeowners within Lot 9's <br />development) do not owe any additional fee. The Lot 23 fee is adjusted to reflect <br />the increase in the actual cost of the Part 2 infrastructure, with the credit adjusted <br />to equal the full actual cost. This increase is also, allocated to all future <br />development. <br />Financing Program #13. Estimated costs for each unbuilt shared infrastructure <br />improvement shall be adjusted annually on January 1 by the City Engineer based on the <br />inflation factors found in the Engineering News Record for the most closely associated <br />construction projects. <br />Example 13A. Water mains are estimated to cost 510, 000. As ofJanuary 1. in <br />Year 1, the ENR index shows a 5% increase for water line projects. The new <br />estimated cost would be 510,000 x 1.05 = 510,500. In Year 2, if the water mains <br />remain unbuilt and if the ENR rate is 4 %, the new cost would be 510.500 x 1.04 = <br />510, 920. <br />Financing Program #14. Each year. on January 1, the interest for the past year or years <br />owed to any developer entitled to reimbursement (Financing Program #20) or to the City <br />for improvements made with funds other than Specific Plan fees shall be added to the <br />total cost used in determining that year's Specific Plan fee. <br />Example 1 4A. Developer A installed sewer improvements which cost 530.000 <br />more than his total fee obligation. As ofJanuary 1 in Year 2. Developer A is <br />entitled to reimbursement of the 530,000 plus 8% interest. or 53 2.400. The <br />532,400 figure is used in calculating the fee to be applied to all development in <br />Year 2. <br />Example 14B. City installs water improvements in Year 1 which cost 5100.000 <br />using Water Fund monies. City is eligible for reimbursement to the Water Fund <br />at the 8% rare. The fee in Year 2 would use SI 08.000 for the cost of these water <br />improvements in calculating the Year 2 fee. <br />9 <br />