Laserfiche WebLink
08/08/02 10:51 FAX 925 AR4 8234 <br />Unconstructed infrastructure: 550,000 + $30, 000, <br />adjusted for 5% inflation (54, 000) _ <br />City funded infrastructure not using Specific Plan funds, + <br />adjusted for 8% reimbursement (520, 000 @ 8% interest) <br />54,000 City administration fee + <br />(55.000 Fund balance adjusted for interest earned @ 4 %) - <br />CITY - PLEASANTON Z014/022 <br />Example 16A. Assume the simpl wing assumption of a Specific Plan with 100 <br />units in the Plan Area, with four infrastructure improvements cost 55.000, <br />515, 000, 530, 000, and 550,000 respectively. In Year 1, Developer A builds 10 <br />units and installs the 55,000 improvement. Developer A pays S5.000 into the <br />Fund to equal the 510,000 total share his 10 units represent of the total 5100.000 <br />improvement cost. In Year 1 City installs the 515,000 improvement using its <br />water fund, but its cost is 520, 000. In Year 2, Developer B builds 50 writs <br />requiring no infrastructure. Developer B will pay afee equal to: <br />584.000 <br />521,600 <br />S 4,000 <br /><S 5.200> <br />5104.400 <br />— 90 units remaining = 51,160 /unit, or, for 50 units, 558,000 <br />Example 16B. Assuming the same simplifying assumptions as in Example 16A, in <br />Year 1 Developer A constructs the 550,000 improvement for 555.000 and builds <br />20 units. He pays no fee and is eligible for reimbursement of $55.000 — 521.000 <br />= 534,000 (adjusted lot share cost = 51,050; total share is 20 x 51,050 = <br />521, 000). In Year 3 Developer B constructs the 515.000 improvement for <br />520,000 and builds 30 units. Developer B pays a fee equal to: <br />• unconstructed infrastructure 55.000 + S30, 000 <br />• plus Developer B's cost for infrastructure <br />• plus inflation @ 5% for 2 years for <br />unconstructed infrastructure <br />535,000 @ 1.05 x 1.05 - $35,000 <br />• plus balance of reimbursable costs <br />• plus interest @ 8% for 2 years for <br />reimbursable costs <br />534,000 @.1.08 x 1.08 - 534,000 <br />• plus two years' administration fee <br />• less Fund balance <br />• divide by remaining lots <br />(including project) [80 units] <br />11 <br />• 535.000 <br />• 520.000 <br />= 5 3,588 <br />• 534,000 <br />• 5 5,658 <br />• 5 8,000 <br />_ -- -0 - - -- <br />5106,246 <br />51,328/unit <br />Thus, Developer B would pay 30 units x 51,328/unit = 539,840, less the credit for <br />installed infrastructure (520, 000), or a total of 519, 840. This would go into the <br />Fund Developer A would be eligible for the pro rata reimbursement from <br />Developer B's payment into the Fund. This would be 30 units' share of the <br />improvement installed (555, 000), or 30 /100ths of 555,000 = 516, 500. Developer <br />