My WebLink
|
Help
|
About
|
Sign Out
JL CONSTRUCTION - REIMBURSEMENT AGMT FOR WATER MAIN IMPROVEMENTS
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
J
>
JL CONSTRUCTION - REIMBURSEMENT AGMT FOR WATER MAIN IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2007 3:03:17 PM
Creation date
10/24/2007 1:49:40 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
4/25/1989
LONG TERM AGREEMENTS - NAME
JL CONSTRUCTION
LONG TERM AGREEMENTS - TYPE
REIMBURSEMENT AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF PLEASANTON <br />P.O. BOX 520 PLEASANTON, CALIFORNIA 94566-0802 <br />CITY OFFICES <br />123 MAIN STREET <br />CITY couNCa <br />481-8001 <br />CITY MANAGER <br />484-0008 <br />CITY ATTORNEY <br />484-8003 <br />FINANCE <br />484.8033 <br />PERSONNEL <br />ae4-aolz <br />CITY OFFICES <br />200 OlD BERNAL AVE. <br />PLANNING <br />a84-BO23 <br />ENGINEERING <br />484$041 <br />BUILDING INSPERION <br />484.8015 <br />COMMUNITY SERVICES <br />aa4.8160 <br />WATER -BILLING <br />484-8038 <br />FIELD SERVICES <br />5335 SUNOL BLVD. <br />PARKS <br />484-8056 <br />SANITARY SEWER <br />484$061 <br />STREET <br />484.8066 <br />WATER <br />aa4.8on <br />FIRE <br />4441 RAILROAD AVE. <br />484-8114 <br />POLICE <br />4833 BERNAL AVE. <br />P.a Box 909 <br />aa4-else <br /> <br />March 31, 1989 <br />Mr. Gary Whitesides <br />JL Construction <br />1811 Santa Rita Road, Suite 205 <br />Pleasanton, CA 94566 <br />Re: 16" Water Main Extension on Foothill Road <br />Dear Mr. Whitesides: <br />We have reviewed your cost breakdown dated <br />March 30, 1989 and would like you to proceed with <br />construction as agreed with the following changes: <br />As discussed with J & M Contractors, instead of using <br />cement treated base (CTB) we will match the existing <br />pavement section on Foothill Road. This will be a <br />$10,000 cost saving item for the City. <br />Adjusted cost breakdown: <br />Engineering $ 6,000.00 <br />Surveying 700.00 <br />Soils Engineering 500.00 <br />Utility Contractor 102,000.00 <br />JL Overhead 15$ 16.380.00 <br />Total Cost $125,580.00 <br />An agreement for payment between the City and <br />JL Construction will follow. <br />If you have any questions, please call me at 484-8041. <br />Very truly yours, <br />ffoseph Elliott <br />Director of Public Works <br />and Utilities <br />JE/sv <br />cc: Dennis Beougher <br />EXHIBIT A <br />
The URL can be used to link to this page
Your browser does not support the video tag.