Laserfiche WebLink
EXHIBIT B <br />REIMBURSEMENT AGREEMENT <br />ADAMS, MADDEN, HANK CO. <br />REIMBURSABLE COSTS: <br />Engineering $ 10,000 <br />Construction 85,000 <br />Inspection Fees 2,900 <br />Subtotal $ 97,900 <br />5°~ Admin. By City 4,895 <br />Total $102,795 <br />CONNECTION FEES: <br />To be spread as shown below. <br />Parcel No. Owner % Initial Fee <br />941-600-23,24,25 Madden 9.90% $ 10,094 <br />941-600,26,27 Adams 12.86% 13,113 <br />946-3200-2-5 Adams 14.13% 14,408 <br />946-1100-7 Geremia 12.70% 12,949 <br />946-1100-8 Theodore 3.08% 3,140 <br />946-1100-9 Theodore 4.89% 4,986 <br />946-1100-11 Hirata 7.20% 7,339 <br />946-1100-12 Rose, D. 8.80% 8,973 <br />946-1100-14 Rose, M. 3.57% 3,641 <br />946-1100-15 Hank Co. 4.51% 4,599 <br />946-1100-17 Pleas. Cabinet Shop 18.36% 18,721 <br />Interest at 12% per annum to be added to above Initial Fees after June 30, 1981. <br />Ninety-five percent of above Total Fees to be reimbursed to Developer at the ratio <br />shown below: <br />Reimbursement Ration <br />Madden 23.90% <br />Adams 65.21% <br />Hank Co. 10.89% <br />100.00% <br />