Laserfiche WebLink
costs within 30 days of the date of an invoice from City detailing the costs <br />incurred. <br />b. City shall at all times have access to the Project for inspection or other purposes <br />while it is under construction. After completion of the project, should the City <br />require access to any facilities of the Project, the City shall provide Company with <br />forty-eight (48) hours notice of such requirement and Company shall provide a <br />representative to be present at the City's entry of such facilities. Excepting <br />emergency situations in which such notice is not possible, and then with such <br />notice as is possible under the circumstances, the City shall not enter Project <br />facilities except in the presence of a representative of Company. <br />c. After completion of all work, Company shall exercise reasonable care in inspecting <br />and maintaining the area affected by the encroachment. While the Project is in the <br />Right of Way and within one year after the Project has been removed, Company <br />shall repair and make good any injury or damage to any portion of the Right of <br />Way and any other affected area which would not have occurred had such work <br />not been done. Company shall, upon notice from City, immediately repair any <br />injury, damage or nuisance, in any portion of the Right of Way resulting from the <br />Project's construction, installation, maintenance, or removal. If Company fails to <br />act promptly, or should the injury or damage constitute a hazardous or emergency <br />situation, requiring repairs or replacement to be made before Company can be <br />notified or can respond to the notifications, City may, at its option, make the <br />necessary repairs or replacement or perform the necessary work, and Company <br />shall be charged with all the expenses incurred in the performance of the work. <br />d. Any work or use done under the Encroachment Permit shall conform to the <br />standards and specifications established by the City. In the absence of specific <br />standards and specifications, recognized standards of construction or approved <br />practices shall govern the work or use. <br />e. Unless otherwise approved by the City, no material shall be stored within five feet <br />of a public street. In addition, excess earth materials from trenching or other <br />operations shall be removed from the pavement, traveled way, or shoulder as the <br />trench is backfilled or other work carried forward. <br />4. CITY'S RESPONSIBII.ITIES. City shall at no time be responsible for the repair <br />or replacement of the Project or other improvements by Company. <br />5. INDEMNIFICATION. Company shall indemnify and hold City harmless against <br />and from any and all claims or suits for damages or injury including but not limited to, the Project <br />or any structures, foundations, or other improvements of Company, arising from the use of the <br />Right of Way or from any activity, work or thing done, permitted or suffered in or about the <br />Right of Way, excepting such claims or suits for damages or injury arising from the sole <br />negligence or willful misconduct of City. Company also shall indemnify, defend and hold City <br />vlCImetro Encroachment Agreement 2 <br />