My WebLink
|
Help
|
About
|
Sign Out
MILLER - SUBDIVISION AGREEMENT
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
M
>
MILLER - SUBDIVISION AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2007 3:49:13 PM
Creation date
10/26/2007 3:12:35 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
10/24/2004
LONG TERM AGREEMENTS - NAME
MILLER
LONG TERM AGREEMENTS - TYPE
SUBDIVISION AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOW, THEREFORE, in consideration of the faithful performance of the <br />promises, terms, conditions and covenants set forth herein by Subdivider and the <br />approval of the map for recording by the City, the parties hereto agree as follows: <br />1. Time of Essence. Time is of the essence in the performance of this <br />Agreement. The work and improvements required by this Agreement to be completed by <br />Subdivider shall be completed within one (1) year from the above-mentioned date of this <br />Agreement. <br />The City may extend the time for completion of improvements hereunder, upon <br />good cause being shown by the Subdivider. Any such extension may be granted without <br />notice to the Subdivider's surety, any extension so granted shall not relieve the surety's <br />liability on the bond to secure the faithful performance of this Agreement. <br />2. Work. Subdivider will do or cause to be done and performed the <br />following described work: Improvements pursuant to plans and project bond estimates <br />entitled <br />"a)Improvement Plans, PM 8214, dated August, 2004, Pleasanton, California and Bond <br />stimate for PM 8214, dated June 22, 2004 and subsequent revisions to plans," prepared <br />by Al Pascual & Associates, Inc and approved by the City Engineer and <br />"b)Landscaping Plans, Gillian Court, PM 8214, Pleasanton, Calilfornia, and subsequent <br />revisions to plans" prepared by A. S. Dutchover & ASSOCIATES, APPROVED BY <br />THE City Engineer. <br />3. Inspection. City shall inspect all of said work through an inspector <br />employed by City at the cost and expense of Subdivider, and Subdivider shall pay City <br />the cost of such inspection as fixed by Ordinance. <br />The City Engineer has tentatively fixed the inspection costs for on-site <br />improvements due upon execution of this agreement as follows: <br />$4400.75 <br />4. Soils Report. Subdivider shall provide a preliminary soils report as <br />required by Section 66490 of the Government Code. Said data shall be compiled by a <br />qualified soils testing engineer without expense to the City. <br />5. Plans. All of said work shall be done and materials furnished in strict <br />accordance with the approved plans for said tract filed with the City Engineer, and in <br />accordance with the standard specifications and details of the City of Pleasanton. It is <br />further understood that the work and materials shall be under the supervision of the City <br />Engineer, and performed and installed to his satisfaction. <br />SUBDIVISION AGREEMENT <br />Parcel Map 8214, 2562 Vineyard Avenue <br />Page 2 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.