Laserfiche WebLink
EXHIBIT A <br />1. 29/46 (0.630) of the actual cost of <br />construction of Serenity Terrace through its <br />point of intersection with the westerly edge <br />of Bethel Lane; $ 8,625 <br />2. The actual cost of stubbing the following <br />utilities within Serenity Terrace: <br />a. 12 inch water line for benefit of Bethel Lane. <br />b. Sewer connection to Lot 86 Tract #6618. <br />c. Water connection to Lot 86 Tract #6618. $ 4,625 <br />3. 4/15 of the actual cost of adapting the <br />traffic signal at Foothill Road and Muirwood <br />North to accommodate Serenity Terrace and <br />Bethel Lane. $ 26,667 <br />4. Design, engineering for 1-3 $ 5,934 <br />5. Overhead, contingency $ 4,539 <br />$ 50,039 <br />