My WebLink
|
Help
|
About
|
Sign Out
MT DIABLO NATIONAL BANK
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
M
>
MT DIABLO NATIONAL BANK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2007 4:54:23 PM
Creation date
10/29/2007 8:28:54 AM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
1/14/2000
LONG TERM AGREEMENTS - NAME
MT DIABLO NATIONAL BANK
LONG TERM AGREEMENTS - TYPE
REIMBURSEMENT AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. A traffic signal and related improvements at the intersection of Vervais <br />Avenue and Main Street, as more particularly shown on City approved plans, attached <br />hereto as Exhibit B. <br />2. Reimbursement. As reimbursement, Developer shall recover the costs of the <br />improvements from the City. Said reimbursement shall be based upon the construction costs as <br />shown on the attached Exhibit C. <br />a. As reflected in Exhibit "C", Developer's most current estimate of the cost <br />to it for for installation of the 2871ineal feet of 8" SDR 35 PVC sanitary sewer pipeline <br />and two 48" standard manholes is the sum of Thirty-two Thousand One Hundred Eighty <br />Nine Dollars and Thirty Cents ($32,189.30). Developer shall submit to City an invoice <br />for the construction work once it is completed. Said cost shall be payable to Developer <br />within thirty (30) days of the date of acceptance of the work by the City. City agrees that <br />it shall process this approval separately of the approval for the items described in <br />paragraph 2. b, below. <br />b. As reflected in Exhibit "C", Developer's most current estimate of the cost <br />to it for the installation of the traffic signals, controllers and related equipment at <br />Vervais Avenue and Main Street is the sum of One Hundred Eighty Five Thousand <br />Eight Hundred Forty One Dollars and Eighty Cents ($185,841.80) Developer shall <br />submit to City an invoice for the construction work once it is completed. Said cost shall <br />be payable within twelve (12) months of the date of acceptance of the work by the City; <br />said sum shall bear interest at the Developer's prime rate plus 1 % from the date of <br />acceptance of the work by City through the date City actually pays said sum to <br />Developer; provided further, if City pays the full sum prior to the expiration of the <br />twelve month period, the interest charge shall be waived. <br />3. Ownership. Ownership of the improvements shall vest with the City when the <br />City accepts the Improvements. <br />4. Term. Developer shall complete the improvements by June 30, 2000. <br />5. Insurance. Developer shall: <br />a. Provide a certificate of insurance providing proof of Workers <br />Compensation. <br />b. Provide a Certificate of Insurance from its insurance carrier showing the <br />amount of General Liability coverage and naming the City of Pleasanton as an additional <br />insured. Insurance coverage shall be in at least the following amounts: <br />GENERAL LIABILITY <br />General Bodily Injury $2,000,000 Per Occurrence <br />General Property Damage $1,000,000 Per Occurrence <br />Or <br />C:\WINDOWS\TEMP\REIMB Traffsig5.doc - 2 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.